**** INSERT NOSCRIPT SECTION HERE!! ****
CECOM Historical Office
Home Brief history Publications Regulations Research Blog About Us
HISTORICAL RESEARCH COLLECTION                        Back to Document Category List

DOCUMENT LIST FOR - Vietnam

0-1 MOHAWK Modernization Program  1965 August-
100 Percent Freeze on Commitments and Hiring  1969 October-
1965 Production Base Support Program  1965 July-
1st Ind, Preliminary Technical Development Plan for the Tactical Automatic Telephone Central Office  1967 December-
1st Interim Report, TM 700A-1.2 215  1967-
221st Signal Company (Pictorial)  1968 January-
360 Counter mortar/Rocket/Artillery Capability  1968 September 12-
360 degree Mortar Locating Radar, AN/TPQ-28, Risk Analysis  1967 October-
4-Wire Plug Supervision (AN/MTC-9)  1967 July-
4th Quarter FY 1967 Overtime and Holiday Pay Requirements  1967 February-
A Guide to marking classified documents  1982-
A Letter to General Besson  1966 December-
A Record for History  1969 January-
A Select Bibliography of Department of Defense Publications of the SEA Conflict  1990 September-
A foreshortened Center Fed Whip Antenna  1965 March 24-
AACOMS Assemblages  1969 December-
AACOMS Assemblages  1969 June-
AACOMS Medium Capacity Subsystem and AN/MRC-115 and Electronic Components Contained Therein  1968 September-
AACOMS Multi-Channel Communications System  1970 November-
AACOMS Program Change Request  1969 May-
AC Power Pack for AN/PRC-62  1965 July-
AC Power Pack for AN/PRC-62  1965 July-
AC Power Supply for Radio Set AN/PRC-25  1965-
AC-DC Converters for Communications-Electronics Equipment  1968 June-
AC-DC Converters for Operations AN/GRC-106 (illegible) from an AC Line  1966 November-
AC-DC Converters to Allow Operation (illegible)  1966 August-
AC-DC Converters to Operate AN/GRC-106 Family Radios from an AC Power Source  1966 October-
AC-DC Converters to Operate AN/GRC-106 Family Radios from an AC Power Source  1966 September-
AC-DC Converters to Operate AN/GRC-106 Family Radios from an AC Power Source  -
ACTIV Interim Report on Replacement Antenna for AT-271  1967 September-
ACTIV  1969, 1972-
ADP Equipment in SEA  1966 May-
ADP Systems Implemented by USAECOM  1962-1928 (sic, presumably 1968)-
AH-1G (?) Hueycobra Aviation Electronics System Management  1967 August-
AIMS Meeting Held 22-23 January 1964 at USAECOM, Fort Monmouth, NJ  -
AIMS program IFF transponders  -
AMC 70 90 Plan Study Directive  1969 August-
AMC History 1962-1968  1968 December-
AMC History Feeder Data  1968 December-
AMC Night Observation Systems Plan (NOSP)  1970 September-
AMC Pre In-process review of Radio Set AN/PRC-62 (Service Test Review)  1967 November-
AMC Project Manager Guidance  1969 September-
AMC Regulation 70-55, R&D Vietnam Laboratory Assistance Program, Army  1971 November-
AMC Representative for New Equipment Introduction  1965 January-
AN/APX-72 Pre-deployment Conference with USARPAC/USARV Representatives at Fort Monmouth on 12 February 1968  1968 April-
AN/ARC and AN/ARM Radios  -
AN/ARN-82 Radio Receiver Set  1970 January-
AN/ARN-83 Direction Finder Set  1970 February-
AN/ASN-64 Doppler Navigation System  1965 December-
AN/ASN-64 Doppler Navigation System  1965 December-
AN/ASN-96 Navigation Set, Night Vision  1968 December-
AN/GRC (illegible)  -
AN/GRC-103  1965 September-
AN/GRC-103  1969 April-
AN/GRC-106 Trained Personnel  1967 July-
AN/GRC-106  1963 August-
AN/GRC-106  -
AN/GRC-106  -
AN/GRC-114  1966, August-
AN/GRC-50 Radio Set…Frequency Engineering Laboratories  1969 July-
AN/GRC-50  1963-
AN/GRC-50  1963-
AN/GRC-50  1964-
AN/GRC-50  -
AN/GRC-87, AN/VRC-34  1964-
AN/GSQ Flight Operations Equipment  1965 April-
AN/MRC-54 installation  1963 (?) October-
AN/MRC-68 Fabrication  1963 November-
AN/MSC-31A and AN/MSC-32A Climatic Test Program  1965 December-
AN/MSQ-85 Mobile Audio Visual Unit  1969 April-
AN/MSQ-85 Mobile Audio Visual Unit  1969 April-
AN/PPS-5  -
AN/PPS-5  -
AN/PRC-25 Series Radios in SEA  1967 May-
AN/PRC-25, AN/VRC-53, AN/GRC-125  1963 June 20-
AN/PRC-38  1963 July-
AN/PRC-8, 9, and 10  1965-
AN/PVS-3 Miniscope (ENSURE 129)  1970 December-
AN/TCC-45, AN/TCC-44 Multiplexer Sets  1963 October-
AN/TPN-5 for USAREUR  1964-
AN/TPN-8 GCA Radars in RVN  1965-
AN/TPN-8 GCA Radars  1965-
AN/TPN-8 Ground Control Approach Radar  1965-
AN/TPQ-28 Radar Set  1968 January-
AN/TPQ-28 Status  1969 September-
AN/TPS-25  1963 October-
AN/TPX-45 for Self-Propelled Hawk  1968 September-
AN/TPX-46 interrogator set  1969-
AN/TRC-90 Contract Technical Assistance Thailand  1965-
AN/TRC-90 Improvement  1965 March-
AN/TRC-90 Parts/Components  1965 July-
AN/TRC-90 SEASIA  -
AN/TRC-90 Training Survey  -
AN/TRC-90 and AN/TRC-129 Assets  1965 July-
AN/TRC-90  -
AN/TRC-90A  1963-
AN/TRC-97B Meeting on Revised ISSA  1969 May-
AN/TRT-22 and AN/TRR-18  1964 November-
AN/TSC-38 Solicitation  1965 April-
AN/TSM-55 (V)5 Maintenance Calibration Facility  1969 December-
AN/TSM-55  1970 April-
AN/UAS-4 IR System  1965 August-
AN/UAS-4 IR System  1965-
AN/UIH/5  1967 June 30-
AN/USD-2  1963 May-
AN/UVS-1, VATLS  1966 January-
AN/VRC-12 Items in Critical supply  1966-
AN/VRC-12  1962 December-
AN/VRC-12  1963 September 12-
AN/VSC-2 Radio Radio Teletypewriter Sets in SEA  1967 May-
AR 700-19, Fifteen Percent Limit for Provisioning of AN/USQ-42, Radio Frequency Monitor Set, Contract DAAB07-68-C-0168  1968 August-
ARVN Requirements for Radio AN/PRC-25  1967 December-
ASA I&L Approval of Advance Procurement Plan No. 2 on AN/PRC-77  1968 June-
AT-784/PRC Homing Antenna  1966 May, June-
AUTODIN  1968 October-
AVCO Radar Absorber  1966 October-
Abbreviated Commodity Management Master Plan for Ground Surveillance Radar, Very Short Range, AN/PPS-9, SEANITEOPS Requirement  1967 October-
Abbreviated Commodity Management Master plan for Radio Transmitter Set AN/PRT-11  1968 October-
Action Sheet Nr 201 "Telescopic Antenna for AN/PRC-25"  1966 October-
Action Sheets 313-14 and 313-15  1967 June-
Actions Pertaining to Vietnam  1968 September-
Actions Required to Accomplish Expedited Procurement  1965 March-
Actions Taken to Improve Supply Performance  -
Actions from COL Snead's visit to Vietnam and Briefing to General Latta  1968 January-
Activation of Units  1966 May-
Ad Hoc group to design AN/GRC-106 Fixes  1969 May-
Addition of IWCS Phase II and III to DoD Master Urgency List  1966 December-
Additional FY67 PEMA Funds for AN/GRC-143  1967 May-
Additional PEMA Secondary Funds to Support Project INFANT  1970 February-
Additional SEA Spaces  1966 December-
Additional Vietnam Information  1968 February-
Adequacy of Communications, VII Corps with !1st Ind AMCCRD  1968 May-
Advance Procurement Plan Number 1 Covering Modem MD-522A/GRC  1969 August-
Advance Procurement Plan Standard Lightweight Avionics Equipment (SLAE)  1969 November-
Advance Procurement Plan for Infrared Detecting Set AN/AAS-24()  1968 November-
Advance Procurement Plan for Tactical Automatic Switching System  1970 January-
Advance Procurement Plan for Tactical Automatic Switching System  1970 May-
Advance Procurement Plan for Very Short Range Ground Surveillance Radar AN/PPS-15  1970 July-
Advance Procurement Plans  1968 March-
Advance Production Engineering Radar Set (illegible)  1965 March-
Aerial Infrared set AN/UAS-4  1964 October-
After Action Report Exercise High Heels 67  1967 November-
Air Conditioner for AN/TSC 54 Mark 5  1965 April-
Air Conditioner for Communications Assemblages  1968 May-
Air Conditioning and Heating Equipment and Systems for ECOM Assemblages  1969 January-
Air Cushion Vehicles  1967 November-
Air Traffic Regulation System (ATRS), 18th Air Traffic Company  1965 May-
Air Traffic Regulation System (ATRS), Air Traffic Company  1965 June-
Air/Sea Rescue Radio AN/PRC-63  1964 August-
Airborne Transponder (ENSURE 336)  1970-
Aircraft Batteries BB-433/A, BB-641/A, BB-649/A  -
Aircraft Used in Development and Production of Aviation Electronics Program  1967 October-
Alarm Set AN/GSS-9()  1969 September-
Alerting Long Range Airborne Radar MTI (Alarm) Program  1970 February-
Alleged Fraudulent Inspection Procedure on Thermal Batteries  1965 February-
Alternate Equipment for AN/TRC-91  -
Amendment of General Orders  1966 June-
Amendment of General Orders  1967 February-
An Khe Air Traffic System Final Report  1967 March-
Analysis of Material Readiness Summary, Volume II, Commanders Statements, 4th quarter, FY68  1969 September-
Analysis of Material Readiness Summary, Volume II, Commanders' Statements, Second Quarter FY66  1966 March-
Analysis of Radio Frequency Interference Test on AN/TSQ-43  -
Analysis of Reasons for Failure to Meet Fourth Quarter FY69 AMC R&D Command Objectives  1968 July-
Analysis of Requirements for Combined Support Facility for Strategic SEA Communications Systems  1967 December-
Analysis of Requirements for Combined Support Facility for Strategic SEA Communications Systems  1967 October-
Analysis of Requirements for Combined Support Facility for Strategic SEA Communications Systems  1967 September-
Analysis of the FY67 USASA Program  1967-
Annual Excess (Deficit) in the Purchase of Stock Fund Items (Millions of Dollars)  -
Annual Historical Summary Army AIMS Program Coordinator  1972 FY-
Annual Historical Summary Intelligence Materiel Commodity Management Office, ECOM  1967 July- 1968 June-
Annual Historical Summary RCS CSHIS-6 (R2)  1968 August-
Annual Historical Summary of USAECOM Project Manager for Selected Tactical Radios  1969 June-December, written 1972 August-
Antenna AN/GRA-93 Requirements  1969 April 3-
Antenna AN/GRA-93  1969 July-
Antenna AN/GRA-93  1969 July-
Antenna AN/GRA-93  1969 July-
Antenna AS-1729/VRC, Authority to Issue  1970, May 15-
Antenna AT-892/PRC-25  1968 April-
Antenna Sheath for Fifteen Foot Whip Antenna for Use with AN/GRC-106, Request for Comprehensive Study on  1968 January-
Antenna Sheath for Fifteen Fort Whip Antenna for Use with AN/GRC-106, Request for Comprehensive Study on  1968 January-
Antenna Sheath for Fifteen Fort Whip Antenna for Use with AN/GRC-106, Request for Comprehensive Study on  1968 October-
Antenna and Switch Problems  1967 October-
Antennas for UH-1B Decca Install  1965-
Applications of Meteorological R&D to SEA  1966 November-
Appointment of Civilian Personnel Officer  1965 July-
Appointment of Directorate Coordinator for Matters Pertaining to the Manning and Equipping of the 221st Signal Company (Pictorial)  1967 April-
Appointment of Members to SEA NITEOPS Integrated Logistics Support Plan Task Force  1968 July-
Appointment of USAECOM Element, Value Engineering Task Force on Radio Set AN/GRC-106  1967 October-
Appointment of Vice President for Delinquent Contracts  1966 December-
Appointment of Vice President for Project SPIN  1967 March-
Approach and Landing Systems  1964 January 1-
Approval of Advance Procurement Plan for the AN/GRC-106  1969 December-
Approval of Engineering Change, Tube Shield Radio Set AN/GRC-10  1966 August-
Approval of Paid Overtime- Martin Wetzel  -
Approval of Procurement Plan for SB-3082  1969 December-
Approval of Procurement Plans and Secretarial Notation of Selected Contracts  1967 November-
Approved MWO for Automatic Shut-off Valve for Vacuum Pumps Used with Surveillance System, Infrared, AN/UAS-4A  1970 November-
Armed Forces Report: Forces for Freedom  1971-
Army Communications in Vietnam  1972 June-
Army Depots versus Contractual Overhaul Director of Material Management  1967 November-
Army Dial  1967 March-
Army Helicopter OH-6A  1969 April-
Army Logistics System Review Board  1965 November-
Army Stock Fund Operations  1968 January-
Army Unveils Night Vision Devices  1968 May 23-
Assignment of Civilian Personnel Officer  1965 March-
Assignment of Customer Relations Team Chief  1967 December-
Assignment of Nomenclature to Communications-Electronics Equipment  1965 July 29-
Assignment to R&D Technical Liaison Team  1968 July 29-
Assignment to R&D Technical Liaison Team  1968 June 17-
Assignments for Project Manager AN/VRC-12 and AN/PRC-25  1962 November-
Assumption of Overseas AUTODIN Task Assignments  1965 October-
Assumption of Responsibilities of the Operational Readiness Office by Comptroller and Director of Program  1970 July-
Attended Area Let Down System, Mark I  1964 July 1-
Audit of the Army's Supply System for Support of Vietnam U.S. Army Electronics Command  1967 July-
Authority to Issue Letter Contracts  1965 June-
Availability of Avionics Equipment  1965 July-
Availability of Motion Picture Footage Documenting the Use of Electronic Equipment in Vietnam  1967 June-
Average Personnel Grade Ceiling Allocation for Electronic Components Laboratory  1965 December-
Aviation AIMI Conference  1969 September-
Avionics Development and Technology  1966-
Avionics Procurement in Support of Aircraft Production Requirements  1970 March-
Avionics Supplies  1965 November-
Avionics Supply Posture in Vietnam  1968 April-
BG Terry's 12 April 1967 Letter to MG Latta  1967 April-
Backup Hard copy list: SEA documents  -
Basic System Description for Cheyenne (AH-56A) Navigation Set, Night Vision, AN/ASN-96  -
Batteries for Squad Radio Receiver, AN/PRR-9  1968 March-
Battery BA-386 and BA-4386  1969 May-
Battery BB-451/U Used with AN/PRC-41 and 47 Radio Sets  1966 November-
Battery Types BA-627/U and BA-628/U  1969 March-
Bell Decca Antenna on UH-1B/D Aircraft  1967 March-
Bell Helicopter Company Alleged Problems with LOHAP/SLAE in the OH-58A Helicopter  -
Bibliography  -
Bibliography  -
Black Book Input  1967 August-
Black Book Input  1967 August-
Black Book Input  1967 December-
Black Book Input  1968 January-
Breakage on AN/PRC-25 Radio Handsets  1966 c.-
Brief History of the Night Vision Program  -
Bristol Contract for AN/PRC-25  1967 August-
Burst Transmission and Reception Equipment AN/GRA-71, AN-GSH-6  1968 May-
Burst Transmission and Reception Equipment AN/GRA-71, AN/GSH-6  1968 May-
C-12 Compass  1967 September-
C-1611()/AIC  -
C-1611/AIC Intercommunication Sets  1965 March-
C-E Trends  1969 October-
C-E Trends  1971 July-
C-E Trends  1972 February-
CH-47 () Chinook Aviation Electronics System Management  1967 August-
CH-47 Static Dissipater  1967 August-
CH-54 () Flying Crane Aviation Electronics System Management  1967 August-
CM2P Milestone Slippage M Battery Test Set AN/PSM-13  1967 September-
CM2P Milestone Slippage on Battery Test Set AN/PSM-13  1966 December-
CM2P Milestone Slippage- Magnesium Dry Batteries BA-4270/U and BA-4279/U  1967 July-
CM2P Milestone Slippage- Magnesium Dry Battery BA-4270/U  1967 July-
CMH Draft Pertaining to SEA/C-E  -
CMMP on Radio Set AN/PRC-62  1965 July-
COMSEC Compatibility of SLAE  1969 January-
COMSEC Explosions with BA-4386 Magnesium Battery  1970 April-
Cables for Inter-com Control Box C-2298  1967 May-
Camera Equipment Identification  1968 May-
Camera Set, Still Picture KS-100  1968 November-
Cancellation of Commodity Management Master Plan  1967 November-
Cancellation of Commodity Management Master Plan  1967 October 26-
Cancellation of Vietnam FY66 and Prior Back Orders  1967 December-
Carrying of Firearms by Civilian Employees of ECOM in USARV  1968 March-
Catalog of STANO Equipment and Systems  1969 November-
Cathode Ray Tube  1967 June-
Central Office Telephone Manual AN/MTC-9  1965 July-
Central Procurement Functions  1968 October-
Certificate of Achievement, Harold Kuntz  1968 June-
Certificate of Achievement, Mr. Joseph F. Siegel  1968 June-
Certificate of Achievement, Ray G. Scott  1968 July-
Changes in Department of the Army Secretariat  1968 April-
Changes to FY70 Provisioning Program  1969 July-
Chapter 1- The Institution  -
Chapter 1- The Institutional Context  -
Chapter 1: The Institutional Context  -
Charter for the Surveillance System, Infrared, AN/UAS-4 Task Force  1965 December-
Check Test of Meteorological Measuring Set AN/TMQ-22 (XE-4)  1968 October-
Civilian Back from War Zone  1968 June 2-
Civilian Hiring Ceiling  1967 December-
Civilian Hiring Freeze on Permanent and Temporary Civilian Positions  1967 May-
Civilian Hiring Freeze  1967 August-
Civilian Hiring Freeze  1967 July-
Civilian Manpower Requirement  1967 February-
Civilian Manpower Requirement, RCS AMCPT-119  1966 January-
Civilian Manpower Requirement, RCS AMCPT-119  1967 March-
Civilian Manpower Requirements for Support of SEA  1967 April-
Civilian Manpower Requirements for Support of SEA  1967 August-
Civilian Overtime  1969 September-
Civilian Personnel Reduction Impact  1967 August-
Civilian Personnel Reduction Impact  1967 July-
Clandestine Surveillance and Reporting Device  1967 April-
Classification of Antenna Group AN/GRA-93 and Antenna Group AN/PRA-5 as Limited Production Type  1968 April 1-
Classification of Antenna Group AN/GRA-93 and Antenna Group AN/PRA-6 as Limited Production Type  1967 September-
Clearance for J. Cummings  1968 May-
Closed Loop Support of SB-86 in TOC's  1968 January-
Closed Loop Support of SB-86 in TOCs  1968 January 8-
Closed Loop Support of SB-86  1968 April-
Collins Radio Single Side Band Radio Equipment  -
Collins Radio Single Side Band Radio Equipment  -
Combat Success Credited to Night Vision Devices  1968 May 23-
Combined DESERT/TROPIC Test Planning Conference, dated 20 August 1064  1964 September-
Command Communications Publication dated November 1967  1967 December-
Command Communications Requirements  1967 November-
Command Review of Army Marine Craft Communications-Electronics Program  1970 November-
Command objectives on radiographic apparatus AN/TAQ-2  1969-
Commander Request Audit Relative to Standard Lightweight Avionics Equipment  1969 May-
Commander's Comments- 24 May 1965  1965 July-
Commander’s Operations Report  1966 February-
Comments on Draft Proposed Revision to DA Approved QMR for an Integrated System for Day/Night Flight Operations, Surveillance and Target Acquisition- Army Aviation Application  1970 December-
Comments on Proposed Letter Requirement-Quick Reaction (LR-QR) for an Individual Survival Vest for Aircrew members  1970 March-
Commodity Management Master Plan for Visual Airborne Target Locator System AN/UVS-1 (U)  1965 February-
Commodity Management of STANO Systems  1970 June-
Commodity Office Assignment of Photo Equipment  1967 October-
Communication Support for New Production Vehicle USAECOM, DMR  1966 June 23-
Communications Central AN/TSC-25  1963 August-
Communications Central AN/TSC-25  1963 August-
Communications Central AN/TSC-26  1969 March-
Communications Evaluation in SEA 1964-1968  -
Communications Security Logistics Audit  1967-
Communications in Vietnam  1968 October-
Communications in a Riverine Environment  1967 November-
Communist China  1964 April-
Comparison Testing AN/ARD-15 and AN/ARD-18 ARDF Systems  1966-
Competitive Procurements  1968 October-
Competitive Procurements  1968 September-
Completed Action  1965 September-
Component Shortages for Handset H-138/U  -
Comptroller and Director of Programs Feeder material for SEA Monograph  1969-1970 c.-
Comptroller and Director of Programs  1968-
Concluding chapter to SEA Support Monograph  1973 May-
Conclusions/Corrections  -
Condition Code H Night Vision Image Intensifier Tubes and Modules  1969 June-
Condition Reservation Code CR C-9 Material  1964 August-
Condition Reservation Code CR C-9 Material  1964 June-
Conditional Release of AN/ARC-116  1970 August-
Conditional Release of SLAE, less AN/ARC-116  1969 June-
Conditional Release, AN/ARC-116 Radios Manufactured by Sylvania  1970 July-
Confirmation of Contract Requirements  1965-
Conformal Coating in Radio Set AN/PRC-77  1968 February-
Constraint of Supply Support  -
Contractor Delinquencies as a Result of Late or Defective Government Furnished Property (GFP)  1968 May-
Contractor Field Maintenance for Data Annotation System AN/AYA-5  1968 September-
Control Over Overtime Costs  1966 September-
Control Over Overtime Costs  1966 September-
Control of Civilian Hiring Ceiling  1967 December-
Control of Civilian Hiring Ceiling  1967 November-
Control of High Grade Positions and Average Salaries  1965 November-
Conversion of Non-Diversional Units in RVN to the AN/VRC-12 Family of Radios  1966 April-
Conversion to Narrow Band FM Radio Sets  1965 January-
Correspondence from Chief of Staff, ARADCOM regarding Supply Support  1965 December-
Counter Mortar Radar AN/MPQ-4A  1965 July-
Counter Mortar Radar AN/MPQ-4A  1965 October-
Counter Mortar Radar AN/MPQ-4A  1965-
Counter Mortar Radar AN/MPQ-4A  1965-
Countermeasures set AN/ALQ-80 (XE-4) and associated ground support equipment  1969-
Crew Served Weapons Night Vision Sight AN/TVS-2  1965 June-
Critical Item Report  1965 February-
Critical Item Report  1965 March-
Critical Shortage of FY69 OMA Funds  1968 September-
Critical Shortage of VRC-12 radios  1969 February-
Current Major Logistical Problems SEA  1967 November-
Current and Proposed Program or Intrusion Detection Hardware  1967 March-
Curtailment of Visits to RVN (Vietnam)  1968 March-
Customer Assistance  1968 December-
Cutaway Line Drawing Showing Internal System of Intensifier Tube  -
DA Accelerated Procurements  1966 April-
DA Approved Material Need for Remotely Monitored Battlefield Sensor Systems REMBASS  1972 April-
DA Approved Revision of the QMDO for a Tactical Radio Communication System  1969-
DA Approved Revision of the QMDO for a Tactical Radio Communications System  1969 June-
DA Approved Small Development Requirement (SDR) for a Radio Frequency Amplifier for use with Radio Set AN/PRC-25  1964 May-
DA Feasibility Study for Airlift to SEA  1967 November-
DA MAS Transaction Italy UET and UEU, Repeater Set AN/MRC-54(U) and Terminal Set AN/MRC-69 (V)  1965 March-
DA Milestone Schedules  1964 July-
DECCA Manpack  1968 May-
DPN-62  1964 September-
DPN-62  1964-
DSA Weapons Systems Support Program  1970 May-
Data Management Plan  1968 August-
Data Management Plan  1968 August-
Decca Antennas  1966 August-
Decca Chain for RVN  1965 May-
Decca Chain for RVN  1965 May-
Decca Maintenance in Vietnam  1967 October-
Declassification of Night Vision Devices  1968 December-
Defective Components for AN/GRC-3 and AN/GRC-4  1967 April-
Defective Fan on AN/TPN-8  1965 February-
Defective GFAE  1967 March-
Defective New Equipment  1964 August-
Defective New Equipment  1964 July-
Defective New Equipment  1964 September-
Defects in Receiver Transmitter RT-77/GRC-9  1967 February-
Defense Procurement Course Graduation Exercises Held  1969 May 1-
Deficiencies in Field Tests re: AN/ASN-64  1967 January-
Delegation of Authority to Approve Awards of Urgent procurements in Support of Operations in South Vietnam and Thailand  1967 June-
Delinquent Deliveries  1965 April-
Delinquent Deliveries, RCS AMC PP-120  1965 May-
Delinquent Deliveries, RCS AMCPP-120  1965 August-
Delinquent Deliveries, RCS AMCPP-120  1965 August-
Delinquent Deliveries, RCS AMCPP-120  1965 December-
Delinquent Deliveries, RCS AMCPP-120  1965 May-
Delinquent Deliveries, RCS AMCPP-120  1965 May-
Delinquent Deliveries, RCS AMCPP-120  1965, December-
Delinquent Deliveries, RCS AMCPP-120  1966 March-
Delinquent Deliveries, RCS AMCPP-120  1968 February-
Delinquent Deliveries, RGS AMCPP-120  1965 December-
Delinquent Requirements on Contracts for Camera Sets KS-15()  1968 November-
Delivery of Pre-Production Samples, AN/FCC-19, Terminal, Telegraph  1965 March-
Deployment RF Monitor Set AN/USQ-42  -
Deployment of AN/MRC-102 and AN/TRC-110 with AN/GRC-50 Radio Sets  1966 November-
Deployment of Equipment  1967-
Deployment of Night Vision Equipment  1967 March-
Deployment of OH-6A Helicopter with SLAE  1969 March-
Depot Receipt Inspection of Major Items  1969 January-
Detection of Vietcong Tunnels in Vietnam  1965 November-
Development Acceptance In-process review for Meteorological Measuring Set AN/TMQ-22  1969 December-
Development, Management, and Operation of Strategic Communications Systems  1965 June-
Dial Telephone Service and the Tandem Switch  1968 October-
Digital Tactical Communications System  1965 April-
Digital Tactical Communications System  1965-
Direction Finder AN/TRD-15  -
Director of Procurement and Production  1967 February-
Directorate of Research and Development Historical Coverage of the Army Role in SEA Technical and Industrial Liaison Office  1967-
Directorate of Research and Development SEA Historical Feeder Report  1968 January- December-
Discrepancy- AN/PRC-25, Bristol Electronics  1967 December-
Distribution and Support of Radio Set AN/FRC-93  1965 April-
Diversity Operation for Radio Set AN/GRC-144  1969 August-
Doppler Navigation Set AN/ASN-64  1967 February-
Draft AMC Regulation, COMSEC  1967-
Draft ENSURE Requirements  1968 January-
Draft QSTAG for HF/RATT and VHF RATT  1969 November-
Draft Regulation- Education and Training New or Modified Equipment and Material  1967 January-
Draft proposed Qualitative Materiel Requirement for Single Channel Collection Sets (Rear)  1970 March-
Draft proposed qualitative material development objective for expendable jammer and deception equipment  1964-
Draft proposed qualitative material requirement for a Radar, Counter mortar, Light  1966 November-
Draft proposed qualitative material requirement for a Radar, Mobile, Hostile Mortar Location, CDOG Fare 439c  1966 November-
Draft proposed qualitative material requirement for an Artillery Locating Radar, CDOG Paragraph 439c(1)  1966 October-
Draft proposed qualitative material requirement for an airborne emitter location ID System- Low  1969-
Draft proposed qualitative material requirement for an improved counter mortar radar AN/MPQ-4A  1966 December-
Draft proposed qualitative material requirement for small tactical voice security equipment  1969-
Draft proposed small development requirement for an Electronic Counter Countermeasure training device  1969 June-
Drafts, General Officers at Fort Monmouth  1970s version-
Dry Batteries  1969 May-
Dry Battery BA-29/U for AN/PRC-8 - 10  1965 November-
Dry Battery Super High Dollar Value Items Submitted to AMC  1967 September-
Dry Battery Support  1965 September-
Dynalens Model S-023 (ACA-20/681)  1968 March-
Dynamic Infrared Countermeasures Simulator  1968 December-
EBPA Tube and Capsule Assembly  -
ECL Candidates for the R&D Team (RVN) Service  1968 January-
ECOM Area Office Personnel  -
ECOM Civilian Personnel Posture  1964 November-
ECOM Commodity Management Master Plan, Magnesium Battery BA-270/U and Magnesium Battery BA-386/PRC-25  1966 January-
ECOM FY 1970 Personnel strength  1969 December-
ECOM Fiscal Year Obligations, 1964-1971  -
ECOM Historical Feeder Reports  1968 July-
ECOM Historical Feeder Reports  1968 July-
ECOM Historical Program  1972 August-
ECOM Items on the Master Urgency List  1967 December-
ECOM Life Cycle Management System  -
ECOM Management for Project SEAMORE  1967 April-
ECOM Manpower Reductions, 1962-1965  -
ECOM Monthly Personnel Authorization and Actual Strength  1963 June-
ECOM Monthly Personnel Authorization and Actual Strength  1964 June- July-
ECOM Monthly Personnel Authorization and Actual Strength  1965 June-
ECOM Monthly Personnel Authorization and Actual Strength  1966 June-
ECOM Monthly Status Report of Delinquent Deliveries  1966 August-
ECOM Monthly Status Report of Delinquent Deliveries  1966 August-
ECOM Monthly Status Report of Delinquent Deliveries  1966 August-
ECOM Monthly Status Report of Delinquent Deliveries  1966 December-
ECOM Monthly Status Report of Delinquent Deliveries  1966 December-
ECOM Monthly Status Report of Delinquent Deliveries  1966 December-
ECOM Monthly Status Report of Delinquent Deliveries  1966 December-
ECOM Monthly Status Report of Delinquent Deliveries  1966 December-
ECOM Monthly Status Report of Delinquent Deliveries  1966 December-
ECOM Monthly Status Report of Delinquent Deliveries  1966 July-
ECOM Monthly Status Report of Delinquent Deliveries  1966 July-
ECOM Monthly Status Report of Delinquent Deliveries  1966 October-
ECOM Monthly Status Report of Delinquent Deliveries  1966 October-
ECOM Monthly Status Report of Delinquent Deliveries  1966 October-
ECOM Monthly Status Report of Delinquent Deliveries  1966 October-
ECOM Monthly Status Report of Delinquent Deliveries  1966 October-
ECOM Monthly Status Report of Delinquent Deliveries  1966 October-
ECOM Monthly Status Report of Delinquent Deliveries  1966 October-
ECOM Monthly Status Report of Delinquent Deliveries  1966 October-
ECOM Monthly Status Report of Delinquent Deliveries  1967 December-
ECOM Monthly Status Report of Delinquent Deliveries  1967 December-
ECOM Monthly Status Report of Delinquent Deliveries  1967 December-
ECOM Monthly Status Report of Delinquent Deliveries  1967 December-
ECOM Monthly Status Report of Delinquent Deliveries  1967 December-
ECOM Monthly Status Report of Delinquent Deliveries  1967 February-
ECOM Monthly Status Report of Delinquent Deliveries  1967 February-
ECOM Monthly Status Report of Delinquent Deliveries  1967 February-
ECOM Monthly Status Report of Delinquent Deliveries  1967 February-
ECOM Monthly Status Report of Delinquent Deliveries  1967 February-
ECOM Monthly Status Report of Delinquent Deliveries  1967 February-
ECOM Monthly Status Report of Delinquent Deliveries  1967 February-
ECOM Monthly Status Report of Delinquent Deliveries  1967 February-
ECOM Monthly Status Report of Delinquent Deliveries  1967 January-
ECOM Monthly Status Report of Delinquent Deliveries  1967 January-
ECOM Monthly Status Report of Delinquent Deliveries  1967 January-
ECOM Monthly Status Report of Delinquent Deliveries  1967 January-
ECOM Monthly Status Report of Delinquent Deliveries  1967 November-
ECOM Monthly Status Report of Delinquent Deliveries  1967 November-
ECOM Monthly Status Report of Delinquent Deliveries  1967 November-
ECOM Monthly Status Report of Delinquent Deliveries  1967 November-
ECOM Monthly Status Report of Delinquent Deliveries  1967 November-
ECOM Monthly Status Report of Delinquent Deliveries  1967 October-
ECOM Monthly Status Report of Delinquent Deliveries  1967 October-
ECOM Monthly Status Report of Delinquent Deliveries  1967 October-
ECOM Monthly Status Report of Delinquent Deliveries  1967 October-
ECOM Monthly Status Report of Delinquent Deliveries  1967 October-
ECOM Monthly Status Report of Delinquent Deliveries  1967 October-
ECOM Monthly Status Report of Delinquent Deliveries  1967 October-
ECOM Monthly Status Report of Delinquent Deliveries  1967 October-
ECOM Monthly Status Report of Delinquent Delivery U.S  1966 August-
ECOM Monthly Status Report of Delinquent Delivery U.S  1966 August-
ECOM Monthly Status Report of Delinquent Delivery U.S  1966 August-
ECOM Monthly Status Report of Delinquent Delivery U.S  1966 August-
ECOM Monthly Status Report of Delinquent Delivery U.S  1966 December-
ECOM Monthly Status Report of Delinquent Delivery U.S  1966 December-
ECOM Monthly Status Report of Delinquent Delivery U.S  1966 June-
ECOM Monthly Status Report of Delinquent Delivery U.S  1966 October-
ECOM Monthly Status Report of Delinquent Delivery U.S  1967 December-
ECOM Monthly Status Report of Delinquent Delivery U.S  1967 December-
ECOM Monthly Status Report of Delinquent Delivery U.S  1967 February-
ECOM Monthly Status Report of Delinquent Delivery U.S  1967 January-
ECOM Monthly Status Report of Delinquent Delivery U.S  1967 January-
ECOM Monthly Status Report of Delinquent Delivery U.S  1967 January-
ECOM Monthly Status Report of Delinquent Delivery U.S  1967 November-
ECOM Monthly Status Report of Delinquent Delivery U.S  1967 October-
ECOM Monthly Status Report of Delinquent Delivery U.S  1967 October-
ECOM Monthly Status Report of Delinquent Delivery U.S  197 November-
ECOM Monthly Status Report of Delinquent Delivery  1966 August-
ECOM Monthly Status Report of Delinquent Delivery  1966 August-
ECOM Monthly Status Report of Delinquent Delivery  1966 August-
ECOM Monthly Status Report of Delinquent Delivery  1966 August-
ECOM Monthly Status Report of Delinquent Delivery  1966 August-
ECOM Monthly Status Report of Delinquent Delivery  1966 August-
ECOM Monthly Status Report of Delinquent Delivery  1966 August-
ECOM Monthly Status Report of Delinquent Delivery  1966 August-
ECOM Monthly Status Report of Delinquent Delivery  1966 August-
ECOM Monthly Status Report of Delinquent Delivery  1966 August-
ECOM Monthly Status Report of Delinquent Delivery  1966 August-
ECOM Monthly Status Report of Delinquent Delivery  1966 August-
ECOM Monthly Status Report of Delinquent Delivery  1966 August-
ECOM Monthly Status Report of Delinquent Delivery  1966 August-
ECOM Monthly Status Report of Delinquent Delivery  1966 August-
ECOM Monthly Status Report of Delinquent Delivery  1966 August-
ECOM Monthly Status Report of Delinquent Delivery  1966 August-
ECOM Monthly Status Report of Delinquent Delivery  1966 August-
ECOM Monthly Status Report of Delinquent Delivery  1966 August-
ECOM Monthly Status Report of Delinquent Delivery  1966 August-
ECOM Monthly Status Report of Delinquent Delivery  1966 August-
ECOM Monthly Status Report of Delinquent Delivery  1966 August-
ECOM Monthly Status Report of Delinquent Delivery  1966 August-
ECOM Monthly Status Report of Delinquent Delivery  1966 August-
ECOM Monthly Status Report of Delinquent Delivery  1966 August-
ECOM Monthly Status Report of Delinquent Delivery  1966 August-
ECOM Monthly Status Report of Delinquent Delivery  1966 August-
ECOM Monthly Status Report of Delinquent Delivery  1966 December-
ECOM Monthly Status Report of Delinquent Delivery  1966 December-
ECOM Monthly Status Report of Delinquent Delivery  1966 December-
ECOM Monthly Status Report of Delinquent Delivery  1966 December-
ECOM Monthly Status Report of Delinquent Delivery  1966 December-
ECOM Monthly Status Report of Delinquent Delivery  1966 December-
ECOM Monthly Status Report of Delinquent Delivery  1966 December-
ECOM Monthly Status Report of Delinquent Delivery  1966 December-
ECOM Monthly Status Report of Delinquent Delivery  1966 December-
ECOM Monthly Status Report of Delinquent Delivery  1966 December-
ECOM Monthly Status Report of Delinquent Delivery  1966 December-
ECOM Monthly Status Report of Delinquent Delivery  1966 December-
ECOM Monthly Status Report of Delinquent Delivery  1966 December-
ECOM Monthly Status Report of Delinquent Delivery  1966 December-
ECOM Monthly Status Report of Delinquent Delivery  1966 December-
ECOM Monthly Status Report of Delinquent Delivery  1966 December-
ECOM Monthly Status Report of Delinquent Delivery  1966 December-
ECOM Monthly Status Report of Delinquent Delivery  1966 December-
ECOM Monthly Status Report of Delinquent Delivery  1966 December-
ECOM Monthly Status Report of Delinquent Delivery  1966 December-
ECOM Monthly Status Report of Delinquent Delivery  1966 December-
ECOM Monthly Status Report of Delinquent Delivery  1966 December-
ECOM Monthly Status Report of Delinquent Delivery  1966 December-
ECOM Monthly Status Report of Delinquent Delivery  1966 December-
ECOM Monthly Status Report of Delinquent Delivery  1966 December-
ECOM Monthly Status Report of Delinquent Delivery  1966 December-
ECOM Monthly Status Report of Delinquent Delivery  1966 December-
ECOM Monthly Status Report of Delinquent Delivery  1966 December-
ECOM Monthly Status Report of Delinquent Delivery  1966 December-
ECOM Monthly Status Report of Delinquent Delivery  1966 December-
ECOM Monthly Status Report of Delinquent Delivery  1966 December-
ECOM Monthly Status Report of Delinquent Delivery  1966 December-
ECOM Monthly Status Report of Delinquent Delivery  1966 December-
ECOM Monthly Status Report of Delinquent Delivery  1966 December-
ECOM Monthly Status Report of Delinquent Delivery  1966 December-
ECOM Monthly Status Report of Delinquent Delivery  1966 December-
ECOM Monthly Status Report of Delinquent Delivery  1966 December-
ECOM Monthly Status Report of Delinquent Delivery  1966 December-
ECOM Monthly Status Report of Delinquent Delivery  1966 December-
ECOM Monthly Status Report of Delinquent Delivery  1966 December-
ECOM Monthly Status Report of Delinquent Delivery  1966 October-
ECOM Monthly Status Report of Delinquent Delivery  1966 October-
ECOM Monthly Status Report of Delinquent Delivery  1966 October-
ECOM Monthly Status Report of Delinquent Delivery  1966 October-
ECOM Monthly Status Report of Delinquent Delivery  1966 October-
ECOM Monthly Status Report of Delinquent Delivery  1966 October-
ECOM Monthly Status Report of Delinquent Delivery  1966 October-
ECOM Monthly Status Report of Delinquent Delivery  1966 October-
ECOM Monthly Status Report of Delinquent Delivery  1966 October-
ECOM Monthly Status Report of Delinquent Delivery  1966 October-
ECOM Monthly Status Report of Delinquent Delivery  1966 October-
ECOM Monthly Status Report of Delinquent Delivery  1966 October-
ECOM Monthly Status Report of Delinquent Delivery  1966 October-
ECOM Monthly Status Report of Delinquent Delivery  1966 October-
ECOM Monthly Status Report of Delinquent Delivery  1966 October-
ECOM Monthly Status Report of Delinquent Delivery  1966 October-
ECOM Monthly Status Report of Delinquent Delivery  1966 October-
ECOM Monthly Status Report of Delinquent Delivery  1966 October-
ECOM Monthly Status Report of Delinquent Delivery  1966 October-
ECOM Monthly Status Report of Delinquent Delivery  1966 October-
ECOM Monthly Status Report of Delinquent Delivery  1966 October-
ECOM Monthly Status Report of Delinquent Delivery  1966 October-
ECOM Monthly Status Report of Delinquent Delivery  1966 October-
ECOM Monthly Status Report of Delinquent Delivery  1966 October-
ECOM Monthly Status Report of Delinquent Delivery  1966 October-
ECOM Monthly Status Report of Delinquent Delivery  1966 October-
ECOM Monthly Status Report of Delinquent Delivery  1966 October-
ECOM Monthly Status Report of Delinquent Delivery  1966 October-
ECOM Monthly Status Report of Delinquent Delivery  1966 October-
ECOM Monthly Status Report of Delinquent Delivery  1966 October-
ECOM Monthly Status Report of Delinquent Delivery  1966 October-
ECOM Monthly Status Report of Delinquent Delivery  1966 October-
ECOM Monthly Status Report of Delinquent Delivery  1966 October-
ECOM Monthly Status Report of Delinquent Delivery  1966 September-
ECOM Monthly Status Report of Delinquent Delivery  1967 December-
ECOM Monthly Status Report of Delinquent Delivery  1967 December-
ECOM Monthly Status Report of Delinquent Delivery  1967 December-
ECOM Monthly Status Report of Delinquent Delivery  1967 December-
ECOM Monthly Status Report of Delinquent Delivery  1967 December-
ECOM Monthly Status Report of Delinquent Delivery  1967 December-
ECOM Monthly Status Report of Delinquent Delivery  1967 December-
ECOM Monthly Status Report of Delinquent Delivery  1967 December-
ECOM Monthly Status Report of Delinquent Delivery  1967 December-
ECOM Monthly Status Report of Delinquent Delivery  1967 December-
ECOM Monthly Status Report of Delinquent Delivery  1967 December-
ECOM Monthly Status Report of Delinquent Delivery  1967 December-
ECOM Monthly Status Report of Delinquent Delivery  1967 December-
ECOM Monthly Status Report of Delinquent Delivery  1967 December-
ECOM Monthly Status Report of Delinquent Delivery  1967 December-
ECOM Monthly Status Report of Delinquent Delivery  1967 December-
ECOM Monthly Status Report of Delinquent Delivery  1967 December-
ECOM Monthly Status Report of Delinquent Delivery  1967 December-
ECOM Monthly Status Report of Delinquent Delivery  1967 December-
ECOM Monthly Status Report of Delinquent Delivery  1967 December-
ECOM Monthly Status Report of Delinquent Delivery  1967 December-
ECOM Monthly Status Report of Delinquent Delivery  1967 February-
ECOM Monthly Status Report of Delinquent Delivery  1967 February-
ECOM Monthly Status Report of Delinquent Delivery  1967 February-
ECOM Monthly Status Report of Delinquent Delivery  1967 February-
ECOM Monthly Status Report of Delinquent Delivery  1967 February-
ECOM Monthly Status Report of Delinquent Delivery  1967 February-
ECOM Monthly Status Report of Delinquent Delivery  1967 February-
ECOM Monthly Status Report of Delinquent Delivery  1967 February-
ECOM Monthly Status Report of Delinquent Delivery  1967 February-
ECOM Monthly Status Report of Delinquent Delivery  1967 February-
ECOM Monthly Status Report of Delinquent Delivery  1967 February-
ECOM Monthly Status Report of Delinquent Delivery  1967 February-
ECOM Monthly Status Report of Delinquent Delivery  1967 February-
ECOM Monthly Status Report of Delinquent Delivery  1967 February-
ECOM Monthly Status Report of Delinquent Delivery  1967 February-
ECOM Monthly Status Report of Delinquent Delivery  1967 February-
ECOM Monthly Status Report of Delinquent Delivery  1967 February-
ECOM Monthly Status Report of Delinquent Delivery  1967 February-
ECOM Monthly Status Report of Delinquent Delivery  1967 February-
ECOM Monthly Status Report of Delinquent Delivery  1967 February-
ECOM Monthly Status Report of Delinquent Delivery  1967 February-
ECOM Monthly Status Report of Delinquent Delivery  1967 February-
ECOM Monthly Status Report of Delinquent Delivery  1967 February-
ECOM Monthly Status Report of Delinquent Delivery  1967 February-
ECOM Monthly Status Report of Delinquent Delivery  1967 February-
ECOM Monthly Status Report of Delinquent Delivery  1967 February-
ECOM Monthly Status Report of Delinquent Delivery  1967 February-
ECOM Monthly Status Report of Delinquent Delivery  1967 February-
ECOM Monthly Status Report of Delinquent Delivery  1967 February-
ECOM Monthly Status Report of Delinquent Delivery  1967 February-
ECOM Monthly Status Report of Delinquent Delivery  1967 February-
ECOM Monthly Status Report of Delinquent Delivery  1967 February-
ECOM Monthly Status Report of Delinquent Delivery  1967 February-
ECOM Monthly Status Report of Delinquent Delivery  1967 February-
ECOM Monthly Status Report of Delinquent Delivery  1967 January-
ECOM Monthly Status Report of Delinquent Delivery  1967 January-
ECOM Monthly Status Report of Delinquent Delivery  1967 January-
ECOM Monthly Status Report of Delinquent Delivery  1967 January-
ECOM Monthly Status Report of Delinquent Delivery  1967 January-
ECOM Monthly Status Report of Delinquent Delivery  1967 January-
ECOM Monthly Status Report of Delinquent Delivery  1967 January-
ECOM Monthly Status Report of Delinquent Delivery  1967 January-
ECOM Monthly Status Report of Delinquent Delivery  1967 January-
ECOM Monthly Status Report of Delinquent Delivery  1967 January-
ECOM Monthly Status Report of Delinquent Delivery  1967 January-
ECOM Monthly Status Report of Delinquent Delivery  1967 January-
ECOM Monthly Status Report of Delinquent Delivery  1967 January-
ECOM Monthly Status Report of Delinquent Delivery  1967 January-
ECOM Monthly Status Report of Delinquent Delivery  1967 January-
ECOM Monthly Status Report of Delinquent Delivery  1967 January-
ECOM Monthly Status Report of Delinquent Delivery  1967 January-
ECOM Monthly Status Report of Delinquent Delivery  1967 January-
ECOM Monthly Status Report of Delinquent Delivery  1967 January-
ECOM Monthly Status Report of Delinquent Delivery  1967 January-
ECOM Monthly Status Report of Delinquent Delivery  1967 January-
ECOM Monthly Status Report of Delinquent Delivery  1967 January-
ECOM Monthly Status Report of Delinquent Delivery  1967 January-
ECOM Monthly Status Report of Delinquent Delivery  1967 January-
ECOM Monthly Status Report of Delinquent Delivery  1967 January-
ECOM Monthly Status Report of Delinquent Delivery  1967 March-
ECOM Monthly Status Report of Delinquent Delivery  1967 November-
ECOM Monthly Status Report of Delinquent Delivery  1967 November-
ECOM Monthly Status Report of Delinquent Delivery  1967 November-
ECOM Monthly Status Report of Delinquent Delivery  1967 November-
ECOM Monthly Status Report of Delinquent Delivery  1967 November-
ECOM Monthly Status Report of Delinquent Delivery  1967 November-
ECOM Monthly Status Report of Delinquent Delivery  1967 November-
ECOM Monthly Status Report of Delinquent Delivery  1967 November-
ECOM Monthly Status Report of Delinquent Delivery  1967 November-
ECOM Monthly Status Report of Delinquent Delivery  1967 November-
ECOM Monthly Status Report of Delinquent Delivery  1967 November-
ECOM Monthly Status Report of Delinquent Delivery  1967 November-
ECOM Monthly Status Report of Delinquent Delivery  1967 November-
ECOM Monthly Status Report of Delinquent Delivery  1967 November-
ECOM Monthly Status Report of Delinquent Delivery  1967 November-
ECOM Monthly Status Report of Delinquent Delivery  1967 November-
ECOM Monthly Status Report of Delinquent Delivery  1967 November-
ECOM Monthly Status Report of Delinquent Delivery  1967 November-
ECOM Monthly Status Report of Delinquent Delivery  1967 November-
ECOM Monthly Status Report of Delinquent Delivery  1967 November-
ECOM Monthly Status Report of Delinquent Delivery  1967 November-
ECOM Monthly Status Report of Delinquent Delivery  1967 November-
ECOM Monthly Status Report of Delinquent Delivery  1967 November-
ECOM Monthly Status Report of Delinquent Delivery  1967 October-
ECOM Monthly Status Report of Delinquent Delivery  1967 October-
ECOM Monthly Status Report of Delinquent Delivery  1967 October-
ECOM Monthly Status Report of Delinquent Delivery  1967 October-
ECOM Monthly Status Report of Delinquent Delivery  1967 October-
ECOM Monthly Status Report of Delinquent Delivery  1967 October-
ECOM Monthly Status Report of Delinquent Delivery  1967 October-
ECOM Monthly Status Report of Delinquent Delivery  1967 October-
ECOM Monthly Status Report of Delinquent Delivery  1967 October-
ECOM Monthly Status Report of Delinquent Delivery  1967 October-
ECOM Monthly Status Report of Delinquent Delivery  1967 October-
ECOM Monthly Status Report of Delinquent Delivery  1967 October-
ECOM Monthly Status Report of Delinquent Delivery  1967 October-
ECOM Monthly Status Report of Delinquent Delivery  1967 October-
ECOM Monthly Status Report of Delinquent Delivery  1967 October-
ECOM Monthly Status Report of Delinquent Delivery  1967 October-
ECOM Monthly Status Report of Delinquent Delivery  1967 October-
ECOM Monthly Status Report of Delinquent Delivery  1967 October-
ECOM Monthly Status Report of Delinquent Delivery  1967 October-
ECOM Monthly Status Report of Delinquent Delivery  1967 October-
ECOM Monthly Status Report of Delinquent Delivery  1967 October-
ECOM Monthly Status Report of Delinquent Delivery  1967 October-
ECOM Monthly Status Report of Delinquent Delivery  1967 October-
ECOM Monthly Status Report of Delinquent Delivery  1967 October-
ECOM Monthly Status Report of Delinquent Delivery  1967December-
ECOM Monthly Status Report of Delinquent Delivery  1967October-
ECOM Monthly Status Report of Delinquent Delivery  -
ECOM Monthly Status Report of Delinquent Delivery  -
ECOM R&D Team  -
ECOM R&D Technical Liaison Team  1967 July-
ECOM R&D Technical Liaison Team  1967 March-
ECOM Recommendations, Development Program for Electronics  -
ECOM Regulation: Maintenance of Supplies and Equipment, Repair and Return of Electronic Equipment to SEA  1970 December-
ECOM Review on the COMSEC Program  1971 January-
ECOM Security Office  1974 November-
ECOM Spends 39 Million with New Jersey Firms  1966 January 16-
ECOM Support of Proposed Fourth Aerial Surveillance Company  1967 May-
ECOM liaison officer in Vietnam  1969 July-
ECOM types of equipment  1965-1970-
EMC Analysis of Multichannel Radio Communication Systems  1969 November-
EMP  1968 June-
ENSURE Item Status  1969 March-
ENSURE Project 217  1968 April-
ENSURE Requirement for AN/GIH-3  1967 April-
Early Award of FY1966 PEMA Contracts  1965 September-
Economical and Timely Buys of Stock Fund Items  1967 April-
Effect of Employment Restrictions on College Recruitment  1969 April-
Effective Utilization of USAECOM Capabilities  1968 November-
Effects of Vehicular Power Supply on Solid State Circuits  1965 March-
Electric Shop, Test Equipment Calibration, AN/TSM-55  -
Electronic Shelter Industry  1965 September-
Electronic Shelter Industry- MYP Plan  1965 October-
Electronic Warfare Laboratory Feeder Report for Historical Coverage of the Army Role in SEA  1967 CY-
Electronic Warfare Laboratory Feeder Report for Historical Coverage of the Army Role in SEA  1968 CY-
Electronic Warfare Laboratory  -
Emergency Request for Approval of MTDA …for the USAECOM Night Vision Laboratory, Fort Belvoir, Virginia  1968 September-
Emphasis on ECOM Primary Mission Areas  1965 October-
Employment Restrictions  1969 May-
Employment of AN/PPS-5  1967 December-
Endorsement to Movement Orders, HQ, ECOM  1967 October-
Endorsement to Movement Orders, HQ, ECOM  1967 October-
Engineering Monitoring of Sylvania SLAE Contract  1969 April-
Engineering Support for Voice Warning System AN/ASH-19  1970 November-
Enlisted Legal Clerks in the Directorate of Procurement and Production  1969 June 10-
Ensure Item 152, SB 3082  1970 September-
Environmental Testing  1966 November-
Equipment Improvement Recommendation, NMP Control Number 0758  1967 October-
Equipment Shortages  1966 June-
Equipments and Systems Using Solid State Devices  1965 March-
Establish External Service Areas  1966 December-
Establishment of AMC Theater Support Offices in Oversea Commands  1965 March-
Establishment of Aircraft Fifth Echelon Overhaul Capability  1965 August-
Establishment of Career Centers for Purpose of Recruitment  1966 May-
Establishment of Combat Surveillance/Target Acquisition Laboratory, U.S. Army Electronic Laboratories  1964 December-
Establishment of Headquarters USAECOM TDA Positions  1966 June-
Establishment of Infrared Surveillance System AN/UAS-4 Task Force  1964 December-
Establishment of MOHAWK Project Manager's Field Office at HQ, ECOM  1964 August-
Establishment of Office of Special Assistant for Aviation and Aviation Electronics  1966 December-
Establishment of Product Manager for Selected Equipment for Army Aircraft  1969 January-
Establishment of a Formal "SEA " Organization  1967 July-
Establishment of a LTC position in Vietnam to be Chief, ECOM activities  1968 April-
Evaluation of Dry Battery, BA-4386  1969 August-
Evaluation of Extended Range Tactical Antenna for Manpack Radios  1969 April 15-
Ewell and Hunt publication, Sharpening the Combat Edge  -
Ewell and Hunt publication, Sharpening the Combat Edge  -
Exceptions to Spec MIL-I-55420(E) for TSQ-43  1965 May-
Execution of AACOMS PEMA Program  1969 April-
Expanded System Requirements for Cheyenne (AH-56A) Navigation Set, Night Vision, AN/ASN-96  -
Expanded Use of USAECOM Cushioned Paper Shipping Sacks (Jiffy Bags) in Europe  1970 March-
Expanded Use of USAECOM Cushioned Paper Shipping Sacks (Jiffy Bags) in Europe  1970 May-
Expedited Award of Contract for Modifications of Meteorological Measuring Set AN/TMQ-22, PR&C  1967 December-
Extended Range Antenna Kit for AN/TRC-24  1965-1966-
Extending the Range of the VRC-12  1967 May-
Extension of Decca System Contract BP 2000  -
FM Story in Vietnam  1966 February-
FM series  1968 March-
FSN 5960-809-1867 Klystron Tube  1968 February-
FSN 6135-240-3200 BA-279/U Forecast  1968 May-
FY 67 Stock Fund Program  1967 April-
FY 69 Stock Fund Obligation Program  1969 February-
FY 69-74 Components RDT&E Program  1968 August-
FY1967 SEA Hiring Limitation  1966 November-
FY1967 SEA Hiring Limitation  1966 November-
FY63 Production Base Support Program, Project Number 26080, Microwave Ferrite Devices  1967 June-
FY64 Project Number 25069, Advance Production Engineering Measure for Squad Radio AN/PRT-4, AN/PRR-9 and Alignment Indicator ID-1189()/PR Change in Scope  1965 June-
FY65 PEMA Program Execution Performance Analysis Reports Control Symbol AMCPP-113  1965 April-
FY65 PEMA Program Execution Performance Analysis Reports Control Symbol AMCPP-113  1965 July-
FY65 Production Base Support Program, PEMA 4920  1964 November-
FY66 PEMA Program Execution Performance Analysis Reports Control Symbol AMCPP-113  1965 August-
FY66 PEMA Program Execution Performance Analysis Reports Control Symbol AMCPP-113  1965 October-
FY66 PEMA Program Execution Performance Analysis Reports Control Symbol AMCPP-113  -
FY66 Production Base Support Program PEMA 4900, Late Starter Project  1965 October-
FY66 Stock Fund Program  1965 November-
FY66 Stock Fund Program  -
FY67 Procurement of Homing Loop Antenna AT-784 ()/PRC  1966 September-
FY67 RDT&E unfunded requirements  1967-
FY68 AMC Command Objectives  1967 October-
FY68 AMC R&D Command Objectives  1967 October-
FY68 ASF Program ECOM  1967 August-
FY68 ASF Program- ECOM  1967 August-
FY68 Basic Research Program for Institute for Exploratory Research  1967 October-
FY68 Command Objectives- October 1967  1967 November-
FY68 Commander's PEMA Program Execution Performance Analysis, Reports Control Symbol AMCPP-113 and AMCPP-133  1968 April-
FY68 Commander's PEMA Program Execution Performance Analysis, Reports Control Symbol AMCPP-113 and AMCPP-133  1968 July-
FY68 Commander's PEMA Program Execution Performance Analysis, Reports Control Symbol AMCPP-113 and AMCPP-133  1968 June-
FY68 Commander's PEMA Program Execution Performance Analysis, Reports Control Symbol AMCPP-113 and AMCPP-133  1968 May-
FY68 PEMA 4900 Program Project number 21527, Expansion of Production Capability  1967 November-
FY68 PEMA Program Execution Performance Analysis Reports Control Symbol AMCPP-113 and AMCPP-133  1968 January-
FY68 Stock Fund Sales Program  1967 November-
FY69 AN/APS-94 and AN/AAS-24 procurements  1969 January-
FY69 Army Stock Fund Operating Program  1968 July-
FY69 Commander's PEMA Program Execution Performance Analysis, Reports Control Symbol AMCPP-113 and AMCPP-133  1968 August-
FY69 Commander's PEMA Program Execution Performance Analysis, Reports Control Symbol AMCPP-113 and AMCPP-133  1968 December-
FY69 Commander's PEMA Program Execution Performance Analysis, Reports Control Symbol AMCPP-113 and AMCPP-133  1968 November-
FY69 Commander's PEMA Program Execution Performance Analysis, Reports Control Symbol AMCPP-113 and AMCPP-133  1968 October-
FY69 Commander's PEMA Program Execution Performance Analysis, Reports Control Symbol AMCPP-113 and AMCPP-133  1968 September-
FY69 Commander's PEMA Program Execution Performance Analysis, Reports Control Symbol AMCPP-113 and AMCPP-133  1968 September-
FY69 Commander's PEMA Program Execution Performance Analysis, Reports Control Symbol AMCPP-113 and AMCPP-133  1969 April-
FY69 Commander's PEMA Program Execution Performance Analysis, Reports Control Symbol AMCPP-113 and AMCPP-133  1969 February-
FY69 Commander's PEMA Program Execution Performance Analysis, Reports Control Symbol AMCPP-113 and AMCPP-133  1969 January-
FY69 Commander's PEMA Program Execution Performance Analysis, Reports Control Symbol AMCPP-113 and AMCPP-133  1969 July-
FY69 Commander's PEMA Program Execution Performance Analysis, Reports Control Symbol AMCPP-113 and AMCPP-133  1969 June-
FY69 Commander's PEMA Program Execution Performance Analysis, Reports Control Symbol AMCPP-113 and AMCPP-133  1969 March-
FY69 Commander's PEMA Program Execution Performance Analysis, Reports Control Symbol AMCPP-113 and AMCPP-133  1969 May-
FY69 Procurement of Semiconductor Duplexer Device for Radar Set AN/PPS-4  1968 December-
FY69 Stock Fund Obligation Program  1969 January-
FY69 Stock Fund Program  1969 March-
FY70 Commander's PEMA Program Execution Performance Analysis, Reports Control Symbol AMCPP-113 and AMCPP-133  1969 August-
FY70 Commander's PEMA Program Execution Performance Analysis, Reports Control Symbol AMCPP-113 and AMCPP-133  1969 October-
FY70 Commander's PEMA Program Execution Performance Analysis, Reports Control Symbol AMCPP-113 and AMCPP-133  1970 August-
FY70 Commander's PEMA Program Execution Performance Analysis, Reports Control Symbol AMCPP-113 and AMCPP-133  1970 January-
FY70 Commander's PEMA Program Execution Performance Analysis, Reports Control Symbol AMCPP-113 and AMCPP-133  1970 July-
FY70 Commander's PEMA Program Execution Performance Analysis, Reports Control Symbol AMCPP-113 and AMCPP-133  1970 March-
FY70 Commander's PEMA Program Execution Performance Analysis, Reports Control Symbol AMCPP-113 and AMCPP-133  1970 March-
FY70 Commander's PEMA Program Execution Performance Analysis, Reports Control Symbol AMCPP-113 and AMCPP-133  1970 May-
FY70 Funding Requirement for USAECOM New Equipment Training  1970 March-
FY70 RDTE Funding for Random Access Discrete Address  1969 July-
FY71 Commander's PEMA Program Execution Performance Analysis, Reports Control Symbol AMCPP-113 and AMCPP-133  1970 August-
FY71 Commander's PEMA Program Execution Performance Analysis, Reports Control Symbol AMCPP-113 and AMCPP-133  1970 December-
FY79 AHR Communications Security Logistics Activity  1979-
Fact Sheet for AN/TSQ-71 Delayed GFP  1968 April-
Fact Sheet in Support of Declassification of First Generation Image Intensifier Devices  1968 February-
Fact Sheets Covering IWCS and AUTODIN  1968 January-
Fact Sheets for General Latta's Black Book for Feb 1968 Trip  1968 January-
Fact Sheets for Night Vision Devices  1967 January-
Failure of Tube in Radio Set AN/GRC-106  1968 September-
Feasibility Study for Floating Electronics Maintenance Facility (FEMF)  1967 November-
Feeder Material for Monograph prepared by the Office of the Project Manager, Night Vision 1 January 1969- 31 December 1970  1969 - 1970-
Feeder Material for Monograph  1971 June-
Field Maintenance of Night Vision Equipment Dir of Maint Engr  1969 February-
Fielding Important Equipment/Systems  -
Fielding Important Equipment/Systems  -
Fielding Important Equipment/Systems  -
Fielding Important Equipment/Systems  -
Fielding Important Equipment/Systems  -
Fielding Important Equipment/Systems  -
Final Report, Squad Radio AN/PRR-9 AN/PRT-4 ACTIV Project Number ACL-60/67, 30 December 1966  1967 March-
Final Reports of the Engineering and Service Tests of Tactical Extended Range Antenna System for Manpack Radio Sets, USATECOM Project Number 6-7-2324-01/02, RDT&E Project Number 1E6-50212-D326-03…  1968 November-
Final Reports, Supplement number 1 to engineering test of radio teletypewriter set AN/GRC-108 (2-1/2 Ton Configuration), and additional engineering test of improved power supply PP-3440/GRC, USATECOM  1968 May-
Final Trip Report  1968 June-
First Generation AACOMS Overhaul Program  1969 April-
First Quarter FY 1969, Overtime and Holiday Pay Requirements  1968 May-
Fiscal Year 1971 Funding Requirement for USAECOM New Equipment Training  1970 November-
Flight Report  -
Follow Up Action on R&D Team Letters  1967 November-
Follow up to Letter Requesting Funds for Installation of C-E Equipment in Army Marine Craft  1967 January-
Formal Development Acceptance IPR of a Tropical Extended Range Antenna Equipment for Manpack Radio Sets per SDR Requirement Approved 24 July 1965  1969 June 16-
Formal Service Test In-Process Review of Radio Set Manpacked, Single Sideband, Medium and High Frequency  1968 February-
Fort Monmouth Installations  -
Fort Monmouth Pumps 140 Million Into Shore Area  1967 January-
Fort Monmouth Team Simulates Plane Problems  1968 June 9-
Forthcoming Contract for Reconfiguration of Radio Teletypewriter Set AN/GRC-108  1966 February-
Fourth USARPAC USAECOM C-E Closed Loop Conference  1968 July-
Frequency Engineering Laboratories Radio Set AN/GRC-50  1969 March-
Future Planning for Research and development  1969 December-
GAO Draft Report on Review of the Procurement of AN/PRC-25 and AN/PRC-77 Radio Sets  1968 September-
GAO Review of Research and Development Management of Electronics/Communications Materiel OSD Case 3034  1969 December-
GAO Review of the Need for Repairing Unserviceable Electronic and Communication Equipment  1966 November- December-
GFAE for FY69 OH-58A Aircraft  1969 November-
General Lotz's SEA Newsletter  -
General Orders Number 35  1965 June-
General Orders  1950s, late-
Generators  1964-
Government Furnished Equipment Shortages of AN/ARN-59 and AN/ARN-30 Components  1966 July-
Government Furnished Material for Development of AH-56A  1967 August-
Ground Based Passive ECM Equipments  1966 c.-
Ground Sensor Terminal, AN/TXD-1  -
Ground to Ground Communications AN/GRC-106  1965-
Guidance Concerning Use of 8100 to 8400 MHz Band in the Federal Republic of Germany  1968 June-
HC-162 Radio Sets  1965-
HC-162D Radio Sets for Vietnam  1965 May-
Handset H-138 as modified by quick fix  -
Handset H-138/U  1968 January-
Handset H-138/u, exploded view without modification  -
Handwritten notes  -
Hay publication  -
Headset-Microphone Assembly, Outside Noise, Rejection Headset  1969-
Heiser publication  -
Helicopter Landing Site Obstacle Detector/Detonator  1967 c.-
Helicopter Multifunction System (HELMS) competitive procurement, one proposal received  1970 January-
Hire of special conveyance in Vietnam  1968 April-
Historical Coverage of Army Role in SEA  1968 July-
Historical Coverage of Army Role in SEA  1968 May-
Historical Coverage of the Army Role in SEA  1965 February- 1966 December-
Historical Coverage of the Army Role in SEA  1968 August-
Historical Coverage of the Army Role in SEA  1968 August-
Historical Coverage of the Army Role in SEA  1968 August-
Historical Coverage of the Army Role in SEA  1968 August-
Historical Coverage of the Army Role in SEA  1968 August-
Historical Coverage of the Army Role in SEA  1968 January- December-
Historical Coverage of the Army Role in SEA  1968 July-
Historical Coverage of the Army Role in SEA  1968 July-
Historical Coverage of the Army Role in SEA  1968 July-
Historical Coverage of the Army Role in SEA  1968 July-
Historical Coverage of the Army Role in SEA  1968 July-
Historical Coverage of the Army Role in SEA  1968 July-
Historical Coverage of the Army Role in SEA  1968 July-
Historical Coverage of the Army Role in SEA  1968 June-
Historical Coverage of the Army Role in SEA  1968 June-
Historical Coverage of the Army Role in SEA  1968 March-
Historical Coverage of the Army Role in SEA  1968 May-
Historical Coverage of the Army Role in SEA  1968 May-
Historical Coverage of the Army Role in SEA  1968 May-
Historical Coverage of the Army Role in SEA  1968 May-
Historical Coverage of the Army Role in SEA  1968 May-
Historical Coverage of the Army Role in SEA  1968 May-
Historical Coverage of the Army Role in SEA  1969 August-
Historical Coverage of the Army Role in SEA  1969 February-
Historical Coverage of the Army Role in SEA  1969 February-
Historical Coverage of the Army Role in SEA  1969 February-
Historical Coverage of the Army Role in SEA  1969 February-
Historical Coverage of the Army Role in SEA  1969 February-
Historical Coverage of the Army Role in SEA  1969 February-
Historical Coverage of the Army Role in SEA  1969 February-
Historical Coverage of the Army Role in SEA  1969 February-
Historical Coverage of the Army Role in SEA  1969 February-
Historical Coverage of the Army Role in SEA  1969 February-
Historical Coverage of the Army Role in SEA  1969 February-
Historical Coverage of the Army Role in SEA  1969 February-
Historical Coverage of the Army Role in SEA  1969 February-
Historical Coverage of the Army Role in SEA  1969 January-
Historical Coverage of the Army Role in SEA  1969 January-
Historical Coverage of the Army Role in SEA  1969 July-
Historical Coverage of the Army Role in SEA  1969 June-
Historical Coverage of the Army Role in SEA  1969 March-
Historical Coverage of the Army Role in SEA  1969 March-
Historical Coverage of the Army Role in SEA  1969 March-
Historical Coverage of the Army Role in SEA  1969 March-
Historical Coverage of the Army Role in SEA  1969 May-
Historical Coverage of the Army Role in SEA  1969 November-
Historical Coverage of the Army Role in SEA  1969 November-
Historical Coverage of the Army Role in SEA  1969 October-
Historical Coverage of the Army Role in SEA  1969 October-
Historical Coverage of the Army Role in SEA  1969 October-
Historical Coverage of the Army Role in SEA  1969 c.-
Historical Coverage of the Army Role in SEA  1970 February-
Historical Coverage of the Army Role in SEA  1971 June-
Historical Coverage of the Army Role in SEA  1971 June-
Historical Coverage of the Army Role in SEA  1971 June-
Historical Coverage of the Army Role in SEA  1971 June-
Historical Coverage of the Army Role in SEA  1971 March-
Historical Coverage of the Army Role in SEA  1972 April-
Historical Coverage of the Army Role in SEA  1972 April-
Historical Coverage of the Army Role in SEA  1972 June-
Historical Coverage of the Army Role in SEA  1973 May-
Historical Coverage of the Army Role in SEA  -
Historical Coverage of the Army Role in Southeast Vietnam  1968 May-
Historical Coverage of the Army Role is SEA  1968 June-
Historical Coverage of the Army Role is SEA  1968 March-
Historical Coverage of the Army Role is SEA  1969 February-
Historical Coverage of the Army Role is SEA  1969 February-
Historical Coverage of the Army Role is SEA  -
Historical Coverage of the Army role in SEA  1968 June-
Historical Coverage of the Army role in SEA  1968 May-
Historical Coverage of the Army role in SEA  1969 February-
Historical Coverage of the Army role in SEA  1970 March-
Historical Coverage of the Army role in SEA  1971 June-
Historical Feeder Reports  1968 May-
Historical Monograph, Project No. AMC 61 M, US Army Electronics Command, Logistics Support of the Army in SEA, 1965- 1970  1972 January-
Historical Monograph, Project No. AMC 61 M, US Army Electronics Command, Logistics Support of the Army in SEA, 1965- 1970  1972 November-
Historical Monograph, Project No. AMC 61 M, US Army Electronics Command, Logistics Support of the Army in SEA, 1965- 1970  1972 November-
Historical Monograph, Project No. AMC 61 M, US Army Electronics Command, Logistics Support of the Army in SEA, 1965- 1970  1972 November-
Historical Monograph, Project No. AMC 61 M, US Army Electronics Command, Logistics Support of the Army in SEA, 1965- 1970  1972 November-
Historical Monograph, Project No. AMC 61 M, US Army Electronics Command, Logistics Support of the Army in SEA, 1965- 1970  1972 November-
Historical Monograph, Project No. AMC 61 M, US Army Electronics Command, Logistics Support of the Army in SEA, 1965- 1970  1972 November-
Historical Monograph, Project No. AMC 61 M, US Army Electronics Command, Logistics Support of the Army in SEA, 1965- 1970  1972 November-
Historical Monograph, Project No. AMC 61 M, US Army Electronics Command, Logistics Support of the Army in SEA, 1965- 1970  1972 November-
Historical Monograph, Project No. AMC 61 M, US Army Electronics Command, Logistics Support of the Army in SEA, 1965- 1970  1972 November-
Historical Monograph, Project No. AMC 61 M, US Army Electronics Command, Logistics Support of the Army in SEA, 1965- 1970  1972 November-
Historical Monograph, Project No. AMC 61 M, US Army Electronics Command, Logistics Support of the Army in SEA, 1965- 1970  1972 October-
Historical Monograph, Project No. AMC 61 M, US Army Electronics Command, Logistics Support of the Army in SEA, 1965- 1970  1972 October-
Historical Monograph, Project No. AMC 61 M, US Army Electronics Command, Logistics Support of the Army in SEA, 1965- 1970  1972 October-
Historical Monograph, Project No. AMC 61 M, US Army Electronics Command, Logistics Support of the Army in SEA, 1965- 1970  1972 October-
Historical Monograph, Project No. AMC 61 M, US Army Electronics Command, Logistics Support of the Army in SEA, 1965- 1970  1972 October-
Historical Monograph, Project No. AMC 61 M, US Army Electronics Command, Logistics Support of the Army in SEA, 1965- 1970  1972 October-
Historical Monograph, Project No. AMC 61 M, US Army Electronics Command, Logistics Support of the Army in SEA, 1965- 1970  1972 October-
Historical Narrative for Squad Radio Set AN/PRT-4, AN/PRR-9  -
Historical Record: Project AACOMS in support of SEA Activities, January 1967- December 1967  1968 July-
Historical Record: Project AACOMS in support of SEA Activities, January 1968-December 1968  1969 January-
Historical Record: Project AACOMS in support of SEA Activities, January 1969-December 1969  1970 February-
Historical Record: Project AACOMS in support of SEA Activities, October 1965-December 1966  1968 April-
Historical Summaries and Feeder Material for Monograph  1971 August-
Historical Summaries and Feeder Material for Monograph  1971 July-
Historical Summaries and Feeder Material for Monograph  1971 June-
Historical Summaries and Feeder Material for Monograph  1971 June-
Historical Summaries and Feeder Material for Monograph  1971 June-
Historical Summaries and Feeder Material for Monograph  1971 June-
Historical Summaries and Feeder Material for Monograph  1971 June-
Historical Summaries, SEA  1971 June-
Historical Summaries, SEA  1971-
Historical Summary Acoustic Reflex Ear Defender System (Ear Protector Electroacoustic MX-7307()/UIC)  -
Historical Summary for SEA  1968-1969-
Historical Summary of USAECOM's Support of US Army Operations in SEA  1971 June-
History of AMC 1962-1968  1968 December-
History of AMC 1962-1968  1968 November-
History of AMC 1962-1968  1968 November-
History of AMC 1962-1968  1968 November-
History of AMC 1962-1968  1968 November-
History of AMC 1962-1968  1968 November-
History of AMC, 1962- 1968  1968 December-
History of AMC, 1962- 1968  1968 December-
History of AMC, 1962- 1968  1968 November-
History of AMC, 1962- 1968  1968 November-
History of AMC, 1962-1968  1968 December-
History of AMC, 1962-1968  1968 December-
History of AMC, 1962-1968  1968 December-
History of AMC, 1962-1968  1968 December-
History of AMC, 1962-1968  1968 December-
History of AMC, 1962-1968  1968 November-
History of AMC, 1962-1968  1968 November-
History of AMC, 1962-1968  1968 November-
History of AMC, 1962-1968  1968 November-
History of AMC, 1962-1968  1968 November-
History of AMC, 1962-1968  1968 November-
History of Fielding Important Equipment/Systems  1968 December-
History of the Squad Radio  1976 November-
Holding Factors- PEMA  1968 January-
Honor Roll for Civilians Who Served in Vietnam  1967 November-
Honor Roll of ECOM Laboratory Representatives in Vietnam  1967-1972-
Honor Roll of ECOM Laboratory Representatives in Vietnam  1967-1972-
IFF/Air defense systems integration  1969-
ITTFL PICO II  1967 January-
IWCS Scheduling Problem  1967 February-
Impact of Civilian Manpower Hiring Ceiling upon ECOM  1967 October-
Impact of Vietnam Conflict on Readiness of Forces  -
Impact on Requirements Resulting from Changes to End Items and Components  1969 March-
Implementation of ECOM Reorganization of R&D Structure  1965 April-
Improved Acoustical Weapons Location Systems  1969 May-
Improved Support of Operational Projects  1970 March-
Improvement of Radio Communications in the Mekong Delta Region  1973 April-
Improvement of Supply Performance DCG for Operations  1968 February-
Improving Back Order and Out of Stock Positions  1964 December-
Improving the AN/GRC-50 Performance  1969 August-
In process review of Balloon Inflation and Launching Device ML-594/U and Meter, Volume, Hydrogen Helium ML-605/U  1967 September-
In-House Value Engineering Study Results in $72,246 Savings for ECOM  1968 January-
In-Process Review Meeting on Visual Airborne Target Locator System (VATLS), AN/UVS-1 (XE-3)  1964 December-
In-house Research and Military Applications  1964 November-
Inadequacy of Depot Capacity to Meet Army and International Commitments  1966 December-
Inadequate Aviator Manning Level in USAECOM  1967 May-
Increase in TD, Intelligence Material Commodity Management  1967-
Increase in depot overhaul resources  1965 August-
Increased Materiel Requirements- Major End Items  1965 September-
Increases to FY66 PEMA Program  1965 August-
Index by source  -
Index by subject  -
Industrial Security Regulation  1984 February-
Information Security Guide  -
Information Security Program Regulation  1982 August-
Initial Flash Report of Delinquent Delivery  1966 February-
Initial Flash Report of Delinquent Delivery  1966 February-
Initial Flash Report of Delinquent Delivery  1966 February-
Initial Flash Report of Delinquent Delivery  1966 October-
Initial Flash Report of Delinquent Delivery  1966-
Initial Flash Report of Delinquent Delivery  1966-
Initial Flash Report of Delinquent Delivery  1966-
Initial Flash Report of Delinquent Delivery  1967 December-
Initial Flash Report of Delinquent Delivery  1967 December-
Initial Flash Report of Delinquent Delivery  1967 February-
Initial Flash Report of Delinquent Delivery  1967 January-
Initial Flash Report of Delinquent Delivery  1967 March-
Initial Flash Report of Delinquent Delivery  1967 November-
Initial Flash Report of Delinquent Delivery  1967-
Initial Flash Report of Delinquent Delivery  -
Initial Production Test of Radar Set AN/MPQ-4A  1969 May-
Initial Production Tests AN/VRC-12 Radios  1969 March-
Inquiries on SEA Problems  1967 December-
Inquiry Concerning Procurement of AN/ASH-19 Voice Warning System  1968 July-
Inspecting and Testing of New Procurement at Contractor's Plant  1969 October-
Installation Kits for TSEC/KY-8 in Aircraft  1966 February-
Installation Kits for TSEC/KY-8 in Aircraft  1966 February-
Installation Realignments and RIF Announcements  1970 March-
Installation and Evaluation of Canadian Marconi Altitude Module in AN/ASN-64 Doppler Navigator  1965 July-
Installation of AN/ALE-29A on UH-1  1969 July-
Installation of AN/ALE-29A on UH-1  1969-
Installation of AN/APN 158-Weather Radar in CV-2 and USF Aircraft  -
Installation of AN/SRC-32 Radios in Army Vessels  1967 March 15-
Installation of DIMATE on Corpus Christi Bay  1968 October-
Installation of Radio Set AN/MRC-73 in Ambulance M43  1965 January-
Installation of Weather Radar AN/APN 158 in USF and CV-2B ACFT USASCV and JUSMAG Thailand  -
Integrated Circuit Squad Radio Receiver AN/PRR-9 (XE-9)  1970 January-
Integrated Circuits in Squad Radio Receiver AN/PRR-9  1967 October-
Integrated Logistics Support Plan for Project Manager, SEA  1969 October-
Integrated Wideband Communications System Coordinator  1968 February-
Integrated Wideband Communications System  1967 September-
Integrated Wideband Communications Systems (IWCS) SEA, Area II  1967 February-
Intensive Management Procedure in Support of SEA  -
Intensive Management of Certain C-E Equipment  1968 August-
Intensive Management of Selected Secondary Items  1968 February-
Interim Message Report for Squad Radio AN/PRT-4 AN/PRR-9  1965-
International Logistics Directorate SEA Support CY 1968  1968-
Interservice Support Agreement for Radio Set AN/TRC-97A  1967 September-
Investigation of Unsatisfactory Performance of AN/ARN-82 (VQR) in UH-1 Helicopter  1967 June-
Invitation to Present Paper at IEEE 1968 Winter Convention  -
Issue of Radio Set AN/GRC-106  1966-
Item for History of AMC, 1962-1968  1968 November-
Items Furnished "In-Country"  1967 December-
Items/Equipments Managed by Chiefs of Commodity Management Offices  1965 June-
Joint U.S. Marine Corps and U.S. Army Test of portable radio transceiver AN/PRC-38 first interim report  1963-
Keynote address by MG Walter E. Lotz at the Eascon 69 Convention  1969 October 27-
Kleinschmidt Repair Parts  1964 November-
Kleinschmidt Repair Parts  1964 November-
LOHAP reliability  1967 October-
LORAN Manpack Receiver  1968 April-
LORAN-DECCA Interface Receiver  1968 May-
LTC Donald Rush TDY to Pacific Field Office  1964 October-
Lack of or Inadequate Air Conditioning for USAECOM End Item Equipments in Vietnam  1968 June-
Lapel Emblems for Civilian Service in Vietnam  1968 September-
Laser Communication System  1967 February-
Leadership  1963 April-
Left Bank Support  1968 September-
Lessons Learned Study, AN/PRC-62 and AN/PRC-74  1968 July-
Lessons Learned  1967 November-
Letter contract FR 36-039-4-4-05589 (E), FY64 Procurement of AN/UAS-4  1964 November-
Letter for USARV  1967 December-
Letter from BG Van Harlingen of 10 March 1968  1968 March-
Letter from LTC Cadmus of 19 November 1967  1967 December-
Letter from Sacramento Army Depot "Receipt of New Procurement"  1968 c.-
Letter of Appreciation to Mr. Harold Ross  1968 March-
Letter of Appreciation  1968-
Letter of Appreciation  1968-
Letter of Appreciation, Mr. A. Mondrick, Jr.  1968 July-
Letter of Appreciation, Mr. Claude E. Snow  1968 August-
Letter of Appreciation, Mr. David Pfaff  1968 July-
Letter of Appreciation, Mr. James H. Parker  1968 March-
Letter of Appreciation, Mr. Stanley J. Shaner  1968 March-
Letter of Appreciation, Thomas Broussard  1968 June-
Letter of Commendation to Herman O. Voigt  1968 June-
Letter of Offer for Military Sales Transaction DA Canada VPH  1967 July-
Letter of Offer for Military Sales Transaction DA Spain  1967 April-
Letter re: 1st logistics supply training classes for EER's en route to Vietnam  1968 June-
Letter re: 25 January 1967 issue of Army Times, cites LTG Betts on "too many shortcoming" in C-E in Vietnam  1967 January-
Letter re: 34th General Support Group visit  1968 May-
Letter re: AN/ARC-54 deployment in new production aircraft  1965 July-
Letter re: AN/GRC-106 production schedules  1967 April-
Letter re: AN/PRC-25 contract with Bristol Electronics  1968 February-
Letter re: AN/PRC-62  1965 March-
Letter re: AN/TPS-25  1968 May-
Letter re: AN/TPS-25, AN/PPS-5  1968 July-
Letter re: AN/TPS-25A  1968 July-
Letter re: AN/TRC-90B  1965 June-
Letter re: AN/VRC-12 and AN/PRC-25  1965 December-
Letter re: AN/VSC-2 Radio Set slippage  1967 January-
Letter re: ARCOV report  1966 August-
Letter re: Advance lift data to preclude lost of misplaced shipments of critical electronics equipment  1968 February-
Letter re: Air Traffic Management  1968 September-
Letter re: Antenna and Packaging Schemes to reduce the outline of radios  1968 September-
Letter re: Army Concept Team in Vietnam (ACTIV) communications problems in the OH-6A helicopter  1968 May-
Letter re: Army Night Vision Goggle Program, ITT Corporation  1969 August-
Letter re: Army aircraft arriving in theater with various types of avionics equipment about which maintenance personnel were not familiar  1965 July-
Letter re: Assignment of C-E Trained Military Personnel to 1st Log Command  1969 July-
Letter re: Availability of AN/PPS-9's  1969 January-
Letter re: Battery BA-505 for Squad Radio Receiver PRR-9  1968 March-
Letter re: Bob Magnant assumes command of the R&D Team  1967 December-
Letter re: Bristol Electronics, Inc. complaints re: government actions involving electrical gages used for acceptance testing of Radio Set AN/PRC-25 modules  1967 December-
Letter re: Bristol Electronics, Inc. complaints re: government actions involving electrical gages used for acceptance testing of Radio Set AN/PRC-25 modules  1967 December-
Letter re: C-7772/GRC Retransmission Unit  1969 April-
Letter re: C-E situation in Vietnam  1968 July-
Letter re: COL Robert E. Kimball TDY to Vietnam  1965 June-
Letter re: CW2 William C. Conrad  1969 June-
Letter re: Capabilities v Requirements, PEMA  1965 July-
Letter re: Closed Loop Program  1968 June-
Letter re: Critical Items List  -
Letter re: Decca Navigation System  1968 May-
Letter re: Decca System problems  1967 November-
Letter re: Delay in deployment of the 221st Signal Co (Pictorial)  1967 February-
Letter re: Direction Finder AN/ARA-50  1967 July-
Letter re: ECOM R&D Team  1967 March-
Letter re: ECOM items of significant interest  1966 December-
Letter re: ECOM's portion of the MOHAWK Project  1966 November-
Letter re: Electrospace Corporation contract for Radio Set AN/PRC-77  1968 August-
Letter re: Electrospace Corporation contract for Radio Set AN/PRC-77  1968 August-
Letter re: Enlisted attorneys  1969 January-
Letter re: Equipment failures and problems with the Squad Radio  1968 November-
Letter re: Examination of helicopter rotor blade  1967 October-
Letter re: General Engler's comments  1965 July-
Letter re: General Latta's visit to USARV  1967 December-
Letter re: General Latta's visit to USARV  1968 January-
Letter re: General Latta, Vietnam visit  1967 October-
Letter re: HRE-Singer open letter order  1964 November-
Letter re: ITT Corporation Night Vision Goggles Contract  1969 May-
Letter re: International Logistics Program adverse affects upon ECOM capability to manage and support needs of Army troops  1967 January-
Letter re: Intrusion detection  1967 November-
Letter re: Night Vision issues  1969 December-
Letter re: Operational value of Decca in Vietnam  1968 September-
Letter re: PEMA obligation rate for the first half of FY63  1962 December-
Letter re: Problem with Collins Radio Company's AN/ARN-82 and -83  1966 April-
Letter re: Procurement of equipment from the Teledyne System Company to be furnished as Government Furnished Equipment to Lockheed Aircraft Company  1968 February-
Letter re: Pulse Form Restorer TD-206  1970 February-
Letter re: R&D Liaison Team sent to Vietnam  1967 October-
Letter re: R&D Team in Vietnam  1968 July-
Letter re: R&D Team operation  1967 October-
Letter re: R&D Team  1967 December-
Letter re: R&D Team  1967 November-
Letter re: R&D Team  1968 February-
Letter re: R&D Team  1968 January-
Letter re: R&D Team  1968 June-
Letter re: Radio set AN/PRC-25, ability of MEMCOR to produce quality radios  1968 April-
Letter re: Raytheon and PCM Multiplexer Sets AN/TCC-45/46 and AN/TCC-53  1966 May-
Letter re: Requirement for FM  1965 May-
Letter re: Requirements for the Squad Radio  1967 June-
Letter re: SEA NITEOPS Program  1967 June-
Letter re: SLAE in Iroquois aircraft  1969 January-
Letter re: SLAE problems  -
Letter re: SLAE  1969 March-
Letter re: SPIN  1967 March-
Letter re: Space General Corporation  1967 March-
Letter re: Summary report of the significant subjects discussed during visits to USAREUR and USARV  1967 October-
Letter re: TO&E for 1st Aviation Brigade, Long Binh, RVN  1968 June-
Letter re: Tactical Narrowband Secure Voice Systems  1968 January-
Letter re: Technical Assistance, 32ND Artillery Brigade  1965 January-
Letter re: Telephone repeaters TA-287/G  1968 November-
Letter re: Traveling Wave Tube 6784  1967 March-
Letter re: Tripod, signaling device, helicopter camera system  1967 January-
Letter re: Tropospheric Scatter Communications Systems  1965 May-
Letter re: VATLS AN/UVS-1  1967 October-
Letter re: VATLS  1969 June-
Letter re: Vietnam Laboratory Assistance Program, Army  1968 November-
Letter re: accuracy of the government gage used for checking the A-4 module for the radio set AN/PRC-25  1967 December-
Letter re: actions taken by ECOM on zero balances list  1968 July-
Letter re: additional costs incurred t rework defective components of the AN/VRC-12 radio set and the AN/GTA-14V Telephone Set  1966 October-
Letter re: adjusting to new organizational and procedural concepts  1963 July-
Letter re: alleged government contractual adjustments with MEMCOR  1966 September-
Letter re: appointment of Charles H. Clark as the Electronics Command's Civilian Personnel officer  1965 July-
Letter re: asking LTG Lotz for assistance in writing the SEA history  1987 June-
Letter re: asking MG Moorman for assistance in writing the SEA history  1987 June-
Letter re: assignment of Leonard Lee to HQ, 2d Logistical Command  1967 January-
Letter re: availability of AN/PPS-9  1969 January-
Letter re: aviation support in Vietnam  1966 October-
Letter re: back order situation at the Command  1965 August-
Letter re: battery for AN/PRC-25, AM-1780 VRC, amplifier/power supplies, AN/PRC-62  1965 November-
Letter re: boundary security systems  1967 December-
Letter re: changes in the SEA NITEOPS Program  1970 May-
Letter re: check of current stock fund procurement practices and inventory statistics  1970 March-
Letter re: commodity management  1965 July-
Letter re: communications between SEA and UNICOM/STARCOM  1966 May-
Letter re: communications problem between Vietnam, Japan, and CONUS regarding requirements and supply procedures for dry batteries  1968 July-
Letter re: communications problem between Vietnam, Japan, and CONUS regarding requirements and supply procedures for dry batteries  1968 July-
Letter re: communications speech security requirements for Army Aircraft  1967 October-
Letter re: concerns over the impact of a combination of factors and policies on the current and future performance of the Electronics Command  1966 April-
Letter re: condition of communications shelters in USAREUR  1968 June-
Letter re: customer requirements in SEA  1968 March-
Letter re: delay in meeting requirement for Public Address Set AN/PIQ-5A  1968 April-
Letter re: delayed supply to the 198th Infantry Brigade  1967 November-
Letter re: demands, receipts, and retrogrades of radio modules  1968 May-
Letter re: deployment of LOH aircraft with new lightweight Avionics equipment  1969 February-
Letter re: direct support maintenance authority for aircraft  1968 February-
Letter re: electronic back orders  1965 July-
Letter re: enlisted personnel lawyers  1969 March-
Letter re: enlisted personnel lawyers  1969 May 26-
Letter re: expediting field fixes  1969 May-
Letter re: fall-off of receipts from central procurement experienced FY 64  1965 July-
Letter re: four Operations Plans developed by ECOM in support of operations in Vietnam  1965 July-
Letter re: four Operations Plans developed by ECOM in support of operations in Vietnam  1965 September-
Letter re: identification of Command needs for personnel space  1965 August-
Letter re: implementation of F.W. Moorman's recommendations post Vietnam trip  1965 April-
Letter re: improving supply management of electronic repair parts  1965 August-
Letter re: integration of the ECOM Field Team into the activities of the Customer Assistance Office, Vietnam  1967 October-
Letter re: interoperability problems, Air Defense Center  1966 November-
Letter re: lack of shelter facilities for the Army Area Communications System  1964 November-
Letter re: lag in reporting all costs applicable to Vietnam  1965 September-
Letter re: level of backorders in the Command  1965 August-
Letter re: logistics posture covering support of the Airborne Loudspeakers, AN/UIH-5 in RVN  1970 February-
Letter re: long time deterioration in 6.1 and 6.2 areas  1968 October-
Letter re: new concept of management for the Military Sales program  1964 July-
Letter re: night vision equipment  1969 April-
Letter re: non-availability of Airborne Communications Consoles  1968 March-
Letter re: pending personnel actions  1969 November-
Letter re: performance of C-E equipment in Vietnam  1965 November-
Letter re: personnel, transportation, USAECOM Area Office  1968 July-
Letter re: planned visit to south Vietnam and Thailand's head of a USACDC-USASTRATCOM team  1967 July-
Letter re: portable Maintenance calibration facility  1969 January-
Letter re: problems in supply of radio set AN/PRC-64  1966 April-
Letter re: problems with the introduction of new equipment  1965 February-
Letter re: processing requisition status requests, large numbers of non-stock items, mission support packages for avionics equipment  1965 May-
Letter re: progress of the Floating Electronics Maintenance Facility (FEMF)  1967 August-
Letter re: project management within the Electronics Command  1965 January-
Letter re: proposed distribution of dry batteries in Vietnam  1968 September-
Letter re: pulling back direct exchange modules and Go-No Go checkers  1965 October-
Letter re: reduction in backlog of Red Ball Express requisitions  1968 January-
Letter re: refrigerated storage facilities for dry batteries in Vietnam  1967 July-
Letter re: review of customer program  1967 July-
Letter re: revised modernization plan  1965 July-
Letter re: signal equipment included in the modernization program for the RVNAF  1964 November-
Letter re: spare parts problems for Radar Set AN/MPQ-4A  1969 February-
Letter re: spare parts/test equipment for the AN/ASN-64 left in SEA by Canadian Marconi  1967 July-
Letter re: status of AN/PRC-25 and AN/PRC-74  1969 January-
Letter re: status of equipping RL teams  1965 September-
Letter re: status of the ECOM Staff Study relative to proposed changes in supply management policies for electronic repair parts  1965 October-
Letter re: stay-behind devices  1968 March-
Letter re: stock fund  1969 April-
Letter re: study related to the development of the Floating Electronics Maintenance Facility (FEMF)  1967 May-
Letter re: supply performance  1966 June-
Letter re: technical assistance contractor personnel conversion to DACs.  1967 February-
Letter re: thanks for the efforts of the personnel of Union Carbide Corporation, Consumer Products Division, in delivering urgently required dry cell batteries  1967 February-
Letter re: the elimination of inventories of obsolete stocks of CX-162/G cable assemblies procured by the Department of the Army  1968 July-
Letter re: urgent need for M372A2 vans to support AN/ASM-189/190 maintenance facilities  1970 March-
Letter re: urgent need for M372A2 vans  1970 February-
Letter re: weather radar TPS-41, air mobility and tactics  1968 January-
Letter re: wire detecting problem  1968 June 20-
Letter report of confirmatory test (type 1) of power supply PP-2953/U  1967-
Letter to Brigadier General Robert D. Terry (re: condition of radar sets in Vietnam with the need for an overhaul program to be developed)  1966 October-
Letter to Honeywell, Incorporated on Single Channel Telegraph Modem  1966 September-
Letters from Vietnam, edited by Bill Adler  -
Letters: R&D Team in Vietnam  1968 April-
Liaison Visits to Units Alerted for Deployment to SEA  1966 September-
Lightweight Ground Surveillance Equipment  1967 June 7-
Lightweight Loudspeaker for AN/PRC-25  1966 July-
Lightweight Observation Helicopter Avionics Package Procurement (LOHAP)  1967 March-
Lightweight Speaker for AN/PRC-25  1966-
List of Delinquent Deliveries Reports  1966 February-
List of Delinquent Deliveries Reports  1966 February-
List of Status Reports  1965 August-
List of Status Reports  1965 August-
List of Status Reports  1965 July-
List of Status Reports  1965 July-
List of Status Reports  1965 June-
List of Status Reports  1965 June-
List of Status Reports  1965 November-
List of Status Reports  1965 November-
List of Status Reports  1965 October-
List of Status Reports  1965 October-
List of Status Reports  1965 September-
List of Status Reports  1965 September-
List of Status Reports  1965 September-
Listing of Vietnam campaigns  1973 September-
Log Periodic Antenna AS-2236 (U)  1969 September 11-
Log Sheets in CG's Absence 23 March - 18 April 1970  1970 March-
Log Support for Fixed Comm-E1 Systems in SEA, RCS CSGLD-OT-1484  1968 June-
Logistic Support of Searchlight Infrared AN/VSS-3 (IKW) (U)  1969 January-
Logistics Management of Commercial ADP (Including Card Handling Equipment)  1966 May-
Logistics Restraints  1966 July-
Loran-D Program  1967 June-
Low Altitude, Fast Rise Meteorological Balloon ML-635  1973 March-
Low Definition Facsimile Equipment AN/GXC-6, Tactical Extended Range Antenna System for Manpack (Antenna Group AN/PRA-93 (HF) and Antenna Group AN/PRA-6 (VHF))  -
Low Light Level TV (LLI/TV)  1969 January-
Low Light Level TV Development (U)  1967 April-
M&O of Bangkok Ubon Philco Tropo  1965 March-
MA-1 Gyro Compass Support Project YYU  1965 April-
MG William B. Latta  -
MG Williamson's Letter to BG Rienzi re Magnetic Cache Detector  1969 April-
MIPRs AS-7-297 and AS-7-392, ARN-83 Automatic Direction Finder Spare Support for O-2A/B Aircraft  1967 September-
MOHAWK Aircraft in the Target Acquisition Role  1964 February-
MOHAWK Sensor Technical Support  1967 January-
MOUs between USACSLA and FORSCOM  1970s c.-
MQM-58A Airborne Surveillance System  1964 July-
MTDA for Headquarters, US Army ECOM  1966 October-
MWO's for Radio Terminal Sets AN/TRC-80, -90, -90A, -90B, -129, and -132  1966 July 28-
Magnesium Batteries  1969 February-
Magnesium Battery BA-4386  -
Magnesium Battery BA-4386/PRC-25  1969 April-
Magnesium Battery BA-4386/PRC-25  1969 December-
Magnesium Battery BA-4386/PRC-25  1969 November-
Magnesium Battery BA-4386/PRC-25  1969 November-
Magnesium Battery BA-4386/PRC-25  1970 May-
Magnesium Battery Problem  1970 February-
Magnesium Dry Batteries  1969 August-
Magneto Problem with 10 KW Engineer Generator  1968 February-
Maintenance Support Meeting for High and Low Capacity AACOMS Systems  1969 April-
Maintenance Calibration Facility AN/TSM-55 (V) 2  1969 September-
Maintenance Calibration Facility AN/TSM55V5  1970 February-
Maintenance Calibration Facility AN/TSM55V5  1970 March-
Maintenance Concept for Radio Sets AN/VRC-12 and AN/PRC-25  1966 January 27-
Maintenance Engineering  1967 November-
Maintenance Evaluation Model for the AN/UAS-4A (U)  1966 April-
Maintenance Evaluation Report Night Vision Sight Crew Served Weapons AN/TVS-2  1968 December-
Maintenance Evaluation Report Night Vision Sight Individual Served Weapon AN/PVS-2  1968 October-
Maintenance Evaluation Report Night Vision Sight Miniaturized AN/PVS-3  1968 October-
Maintenance Evaluation Report Night Vision Sight Tripod Mounted AN/TVS-4  1968 October-
Maintenance Evaluation Report Searchlight Set AN/TVS-3  1968 October-
Maintenance Evaluation on Weather Radar AN/TPS-41  1969 November-
Maintenance Float Requirement for Alternate Battery Acquisition Radar Equipment  1967 December-
Maintenance Support Parts AN/TRC-115  1965 March-
Maintenance Support Plan for Detecting Set, Infrared AN/AAS-24()  1969 January-
Maintenance Support for Camera Set KS-15()  1968 November-
Maintenance Support for MOHAWK Aircraft Systems  1967 March-
Maintenance Support for Night Vision Devices  1969 April-
Maintenance Support, AN/TRC-97B  1969 April-
Maintenance Support, AN/TRC-97B  1969 April-
Maintenance Support, AN/TRC-97B  1969 March-
Maintenance Technical Assistance  1966 December-
Maintenance and Storage Facility for SEA NITEOPS  1968 June-
Maintenance of Radar Set AN/TPQ-28  1969 February-
Major General William Braden Latta bio  -
Man Pack Jungle Radios  1963 May-
Management Analysis of Research and Exploratory Development  1967 December-
Management Conference for AN/TSQ-43  1966 December-
Management in the U.S. Army Electronics Command  -
Management of C-E Material Training  1970 March-
Management of C-E Material Training  1970 March-
Management of ECOM's Personnel Resources  1969 May-
Management of Intrusion Detection  1967 November-
Management of MOHAWK Surveillance System  1969 April-
Management of MOHAWK Surveillance System  1969 February-
Management of Night Vision Program  1966 June-
Management of SEA NITEOPS Program for the UH-1 Helicopter  1968 February-
Manning of the Avionics Configuration Control Facility  1967 April 6-
Manning of the Avionics Configuration Control Facility  1967 April-
Manpack Radio Relay Terminal (PICO)  1966 November-
Manpower Authorization Voucher No. ELC FY 63-1&2  1962 November-
Manpower Implications on LORAN Program  1968 September-
Manpower Utilization Policies- CONUS Sustaining Increment  1967 May-
Manual Telephone Central Office AN/MTC-1  1968 January-
Mao's Primer on Guerrilla War  1962 copyright-
Marine Corps Introduction AN/VRC-12, AN/PRC-25  1964 November 4-
Material Management Directorate Communications/ADP Division  1969 June c.-
Material for History of AMC, 1962-1968  -
Materiel Readiness Activities  1968 March-
Medium Range Night Observation Device AN/TVS-4  -
Meeting 29 August 1967 at Limited War Lab, Aberdeen Proving Ground, Maryland, on the OFF-LEASH SCOUT DOG Program  1967 September-
Memo re: AN/PRC-25, AN/ARC-54, AN/PPS-5  1966 November-
Memorandum of Understanding on Joint Air Force and Army Support of Concept 6 Under Program Element 6, 34, 12, 02F  1967 December-
Memorandum of Understanding  -
Memorandum of understanding between USARV, USARPAC, and ECOM  1966 November-
Message, AMCPT-M 34060, dated 11 July 1966  1966 August-
Met Measuring Set AN/TMQ-22  1968 September-
Meteorological Balloon System, Fast Rising  1965 March-
Meteorological Measuring Set AN/TMQ-22  1968 September-
Methods for Improving the Effectiveness of Jungle Radio Communication  1944 January-
Microminiaturized TACAN  1968 April-
Milestone Chart  1970-
Military Forces in Vietnam  1967 November 20-
Military Potential Test of Radar Tag Device AN/TPQ-23, USATECOM Project number 6-4-6913  1964 September-
Military Urgency Determinations  1965 October-
Milstrip Follow Up of Reqns for Sig Contingency  1965 April-
Minutes of Project Manager's Meeting, 15 November 1965  1965 November-
Minutes of Project Manager's Meeting, 9 August 1965  1965 August-
Misc. notes from meeting with BG James Hollingsworth  1968 February-
Miscellaneous Security regulations and paperwork  -
Miscellaneous notes  -
Miscellaneous notes  -
Miscellaneous notes  -
Miscellaneous notes  -
Miscellaneous notes  -
Miscellaneous notes  -
Miscellaneous notes  -
Miscellaneous notes  -
Miscellaneous notes  -
Miscellaneous notes  -
Miscellaneous notes  -
Miscellaneous notes  -
Miscellaneous notes, Supply and Maintenance FY66 Historical Summary  -
Miscellaneous notes, Supply and Maintenance  -
Miscellaneous  -
Missiles and Electronics Items  1966 August-
Missiles and Electronics Items  1966 December-
Missiles and Electronics Items  1966 October-
Missiles and Electronics Items  1967 December 31-
Missiles and Electronics Items  1967 February-
Missiles and Electronics Items  1967 June-
Missiles and Electronics Items  1967 October-
Missiles and Electronics Items  -
Mobilization Planning with Industry  1965 November-
Mobilization Production Planning with Industry  1970 January-
Models of Operation  -
Modification of AN/GRC-106 Radios  1969 June-
Modification to Gould-Marathon Battery BA-4386  1969 December-
Moisture, Fungus, Corrosion Protection (MFCP) in the Electronics Command  1966 November-
Monthly Report of Activities, CAO-V for August 1967  1967 October-
Monthly Report of Activities, CAO-V for October 1967  1967 November-
Monthly Report of Activities, CAO-V, for November 1967  -
Monthly Report of Activities, CAO-V, for October 1967  1967 November-
Monthly Status Report of Delinquent Delivery U.S> Army Electronics Command  1966 February-
Monthly Status Report of Delinquent Delivery- June  -
Monthly letter to General Norton on Status of Equipment  1966 April-
Mortar locator  1966 March-
Motor, A.C. per ECOM drawing SC-C-65658G  1967 February-
Mounting of weapon sight, Infrared on Rifle M16  1968 July-
Movement Order  1967 November-
Movement Order  1967 September-
Multi Channel Radio Relay Equipment (AN/MRC-54, 69, 73, and AN/MCC-6  1966 November-
Multi Channel Radio Relay Equipment (AN/MRC-54, 69, 73, and AN/MCC-6)  1966 November-
Multi Channel Radio Relay Equipment (AN/MRC-54, 69, 73, and AN/MCC-6)  1966 November-
Multi Channel Radio Relay Equipment (AN/MRC-54, 69, 73, and AN/MCC-6)  1966 November-
Multi-Sensor Program  1966 August-
Multi-Year Procurement of Amplifier AM-1780  1966 October-
Multichannel universal relay package (MURP) Systems  1969-
Multiplexer Set AN/TCC-45  1965 May-
Multiplexer Set AN/TCC-45  1966 May-
Mutual Support of Critical and Short Supply Items  1967 January-
NOTTS Detachment Maintenance Concept for Support of SEA NITEOPS Program  1968 August-
NOTTS Detachment Maintenance Concept for Support of SEA NITEOPS Program  1968 August-
NOTTS Detachment Maintenance Concept for Support of SEA NITEOPS Program  1968 September-
Narrative Analysis of Schedule and Performance Status of Depot Maintenance Program  1968 February-
Narrative Analysis of Schedule and Performance Status of Depot Maintenance Program  1968 March-
Narrowband Secure Voice System  1968 March-
Near Term Improvements in the Army's Ability to "Find the Enemy in Vietnam"  1968 August-
Near Term Improvements in the Army's Ability to "Find the Enemy in Vietnam"  1968 October-
Need for Air Conditioners and Repair Shelters in Vietnam  1967 September-
Need for Revision of CM2P for AN/GRM-69 Signal Generator  1965 December-
Need for Revision of CM2P for AN/GRM-69 Signal Generator  1966 February-
New Equipment Deployed to RVN  1967 October-
New Equipment Training Team Liaison  1967 October-
New Equipment Training  1965 May-
New Equipment Training  1965 May-
New Equipment Training  -
New Family of Radios for Units Deploying to Thailand  1967 August-
New Scope Helps G.I.s Spot Foe at Night  1968 May-
News Release, ECOM Support to Vietnam  1967 October-
News clippings  1963-
Newspaper Articles on Vietnam  1960s, late-
Night Vision Devices  1967 November-
Night Vision Equipment for Combat Vehicles  1969 January-
Night Vision Goggles for Project MASSTER  1970 January-
Night Vision Reassignment  1965 November-
Night Vision Support  1970 July-
No Dramatic Impact at Fort Monmouth  1965 August-
Non -Availability of Helicopters for ASA Projects  1967 January-
Non-Standard Air Conditioners for 125th ATC Company  1967 September-
Non-Stock Numbered Requisition- Vietnam  1967 December-
Notes by source  -
Notes on Manpower  -
Nuclear Radiation/ Equipment Hardness  1965 1968-
OH-6A Avionics MWO Information  1969 March-
OH-6A Cayuse (?) Aviation Electronics System Management  1967 August-
OH/6A SLAE Support  1969 April-
OPLAN SEA  1965 October-
Office of Assistant Chief of Staff for Operational Readiness (OPRED), SEA, HQ, USA ECOM  1965 December-
Office of the Deputy CG for C-E Systems  1969 December-
Office of the Deputy CG for Tactical Communications Systems (Provisional)  1967 October-
Office of the Project Manager Selected Tactical Radios Fact Sheet, AN/VRC-12 Series Radios in SEA  1967 May-
Office of the Project Manager Selected Tactical Radios Fact Sheet, AN/gRC-106 Radio Set in SEA  1967 May-
Officer Shortages  1965 July-
Omni directional Mortar Locating Radar Set AN/TPQ-28 Program  1968 February-
Omni directional Mortar Locating Radar Set AN/TPQ-28 Program  1968 January-
Omni directional Mortar Locating Radar Set AN/TPQ-28 Program  1969 August-
Omni directional Mortar Locating Radar Set AN/TPQ-28 Program  1969 June-
On Site Survey AN/TRC-90 Technical Skill Requirements  -
One Kilowatt Xenon Searchlight AN/VSS-3  1969 May-
Open Requisitions for 5th Infantry Division (Mechanized)  1964 November-
Opens Procurement Course  1969 March 6-
Operation and Maintenance of the DECCA System  1965 February-
Operational Deferment of 1LT E.M. Portner, Jr.  1968 February-
Operational Guidelines  1967 August-
Operational Readiness Action SEA  1967 November 28-
Operational Readiness Office- Organization and Functions  1968 July-
Operational Report of Lessons Learned, HQ !1st Signal Brigade  1967 December-
Operational Report- Lessons Learned, HQ, 2nd Signal Group, for Quarterly Period Ending 31 July 1967  1968 February-
Operational Report- Lessons Learned, HQ, 73rd Signal Battalion  1968 February-
Oregon Trail EW Equipment Status  1965 October-
Organization Changes Proposed by the Special Assistant Aviation and Aviation Electronics  1968 June-
Organization and Function Manual, HQ U.S. Army Vietnam  1969 January-
Organization of Operational Readiness Office  1967 September-
Organization of USAECOM Area Office, Vietnam  1969 December 8-
Ott Publication  -
Overall Responsibility for BA-4386 Magnesium Battery Program  1970 March-
Overrun of Cost- ITT Gilfillan Contract for 360 degree counter mortar radar AN/TPQ-28  1967 September-
Overseer FTX  1964 September-
Overtime Limitation, Fourth Quarter, FY67  1967 April-
P&P Activation of Production Surveillance Activities  1966 July-
PEMA Program Execution Performance Analysis Reports Control Symbol AMCPP-113  1966 July-
PEMA Program  1968-
PM Selected Tactical Radios Weekly Significant Action Report  1966 January-February-
PM's Office for Omni directional Mortar Locating Radar Set AN/TPQ-28  1969 November-
PRC/10 Radio Sets  1965-
Packaging of Small Parts  1968 June-
Panoramic Camera  1965 July-
Paper Bullets Hit the Mark in the Leaflet War  1967 May-
Paper on SEA Communications  1968 January-
Participation by the Test Equipment and Power Sources in SEA Operations  1969-1970-
Participation of Atmospheric Sciences Lab in the Meteorological Aspects of the Chemical and Biological Program  1967 August-
Parts Support for AN/ARC-54 Radio  1966 July-
Pearson publication, The War in the Northern Provinces  -
Performance of Duty  1968 August-
Personal Views Regarding the Adequacy of Manpower  1968 March-
Personnel Authorization  1966 August-
Personnel Summary Sheets  -
Phase III Production Data Package for the Night Vision Sight, passive, Infrared AN/AAS-25 (), formerly Passive Infrared Night Equipment (PINE)  1968 July-
Photographic Coverage of ECOM Projects of Interest in Vietnam  1967 July-
Plan for Transfer of Night Vision Activity from MOCOM to ECOM  1965 November-
Plan of Test for Confirmatory Test of AN/TSQ-43, Tactical Image Interpretation Facility, USATECOM Project 6-3-5910-05, 05,06,06,08  1965 November-
Planning Guidance Air Mobile Companies and Medium Transport Helicopter Companies  1965 August-
Planning for OV-1B/C to OV-1() Conversion  1970 May-
Policy Guidelines for the Execution of the FY68 RDTE Program  1967 December-
Potential Increased Usage of Batteries BB-248/U, BB-249/U and Engine Generator PU-532/PPS-4  1967 April-
Power Reduction Modification Kits for Radar Set AN/PPS-4  1967 June-
Power Reduction Modification for Radar Set AN/PPS-4  1967 May-
Power Supply for Radar Set AN/TPS-33  1968 December 17-
Preliminary Flight Report, MQM-58A Airborne Surveillance System  1964-
Preliminary Flight Report, MQM-58A Airborne Surveillance Systems multipurpose Government Field Training Flight LP-33  1964-
Preliminary Flight Report, MQM-58A Airborne Surveillance Systems multipurpose Government Field Training Flight LP-34  1964-
Preliminary Flight Report, MQM-58A Airborne Surveillance Systems multipurpose Government Field Training Flight LP-69  1964-
Preliminary Flight Report, MQM-58A Airborne  -
Preliminary Status Report, Deadlined Test Equipment  1964 October-
Preliminary Technical Development Plan for the Tactical Automatic Telephone Central Office  1967 December-
Preparation for Contractor Support of AN/AYA-5  1968 November-
Preparation of the Procurement Plan Section of the SEA NITEOPS System Development Plan (SDP)  1968 August-
Presentation on "Commodity Management Guide"  1964 September-
Press Release required on proposed awards in excess of 1,000,000.00  1965 October-
Press Release, new night vision device (image intensification)  1964 October-
Press release re: Philco contract  1966 May-
Probability of Success Evaluation for Program Approaches  -
Problem areas: ASL for avionics detachments, shortages of avionics test equipment, requisitioning, and maintenance  1967 January-
Procedures for Expediting Non-Standard, Urgent Requirements for Equipments (ENSURE)  1967 November-
Procurement Inspection, FY69, US Army ECOM, Fort Monmouth  1969 April-
Procurement Involving AACOMS  1969 August-
Procurement of 31 each Initial Repair Part Packages to support the AN/GRC-103 (V)1 Radio Set  1969 June-
Procurement of 8 each Initial Repair Parts Kits to Support the AN/GRM-95 Test Facility for the Radio Set AN/GRC-103 (V)1  1969 February-
Procurement of AN/TSC-38  1965-
Procurement of AN/TSQ-43  1968 October-
Procurement of Engine Generator Set PU-422  1969 February-
Procurement of Enlisted Lawyers  1968 November 29-
Procurement of OA-1394/GRC and OA-1392/GRC (PRONs C-99-C1226, 1222, 1221, 1219, 1217, 1224)  1969 April-
Procurement of Radio Set AN/GRC-106A, FY70 PEMA Program  1970 April-
Procurement of Radio Set AN/PRC-25  1965 June-
Procurement of S-335()/TRC-113, AN/TTC-23() and S-301()/TCC-61  1968 December-
Procurement of Semiconductor T-R Device for use in Vietnam  1968 May-
Procurement of Teletypewriter Communications Equipment  1965 May-
Procurement support in England  1966-
Procurements involving the Army Area Communications System (AACOMS)  1969 October-
Product Charter for Selected Avionics Equipment for Army Aircraft  1969 January-
Product Charter for Teletypewriters  1968 December-
Production Performance, AN/GRC-87 and AN/VRC-34  1966 May-
Production Plan NBB&RR  1967 September-
Production Progress Reports, DD Form 375  1969 May-
Production Schedules and Acceptances Delinquent Deliveries  1962 December-
Production Schedules and Acceptances Delinquent Deliveries  1964 March-
Production Schedules and Acceptances Delinquent Deliveries  1964 March-
Production Schedules and Acceptances Delinquent Deliveries  1964 March-
Production Schedules and Acceptances Delinquent Deliveries  1965 August-
Production Schedules and Acceptances Delinquent Deliveries  1965 August-
Production Schedules and Acceptances Delinquent Deliveries  1965 August-
Production Schedules and Acceptances Delinquent Deliveries  1965 August-
Production Schedules and Acceptances Delinquent Deliveries  1965 August-
Production Schedules and Acceptances Delinquent Deliveries  1965 August-
Production Schedules and Acceptances Delinquent Deliveries  1965 August-
Production Schedules and Acceptances Delinquent Deliveries  1965 August-
Production Schedules and Acceptances Delinquent Deliveries  1965 August-
Production Schedules and Acceptances Delinquent Deliveries  1965 December-
Production Schedules and Acceptances Delinquent Deliveries  1965 December-
Production Schedules and Acceptances Delinquent Deliveries  1965 December-
Production Schedules and Acceptances Delinquent Deliveries  1965 December-
Production Schedules and Acceptances Delinquent Deliveries  1965 December-
Production Schedules and Acceptances Delinquent Deliveries  1965 January-
Production Schedules and Acceptances Delinquent Deliveries  1965 January-
Production Schedules and Acceptances Delinquent Deliveries  1965 January-
Production Schedules and Acceptances Delinquent Deliveries  1965 January-
Production Schedules and Acceptances Delinquent Deliveries  1965 July-
Production Schedules and Acceptances Delinquent Deliveries  1965 July-
Production Schedules and Acceptances Delinquent Deliveries  1965 July-
Production Schedules and Acceptances Delinquent Deliveries  1965 July-
Production Schedules and Acceptances Delinquent Deliveries  1965 July-
Production Schedules and Acceptances Delinquent Deliveries  1965 July-
Production Schedules and Acceptances Delinquent Deliveries  1965 July-
Production Schedules and Acceptances Delinquent Deliveries  1965 July-
Production Schedules and Acceptances Delinquent Deliveries  1965 July-
Production Schedules and Acceptances Delinquent Deliveries  1965 July-
Production Schedules and Acceptances Delinquent Deliveries  1965 July-
Production Schedules and Acceptances Delinquent Deliveries  1965 June-
Production Schedules and Acceptances Delinquent Deliveries  1965 June-
Production Schedules and Acceptances Delinquent Deliveries  1965 June-
Production Schedules and Acceptances Delinquent Deliveries  1965 June-
Production Schedules and Acceptances Delinquent Deliveries  1965 June-
Production Schedules and Acceptances Delinquent Deliveries  1965 June-
Production Schedules and Acceptances Delinquent Deliveries  1965 June-
Production Schedules and Acceptances Delinquent Deliveries  1965 June-
Production Schedules and Acceptances Delinquent Deliveries  1965 June-
Production Schedules and Acceptances Delinquent Deliveries  1965 June-
Production Schedules and Acceptances Delinquent Deliveries  1965 June-
Production Schedules and Acceptances Delinquent Deliveries  1965 June-
Production Schedules and Acceptances Delinquent Deliveries  1965 June-
Production Schedules and Acceptances Delinquent Deliveries  1965 June-
Production Schedules and Acceptances Delinquent Deliveries  1965 June-
Production Schedules and Acceptances Delinquent Deliveries  1965 June-
Production Schedules and Acceptances Delinquent Deliveries  1965 June-
Production Schedules and Acceptances Delinquent Deliveries  1965 June-
Production Schedules and Acceptances Delinquent Deliveries  1965 June-
Production Schedules and Acceptances Delinquent Deliveries  1965 June-
Production Schedules and Acceptances Delinquent Deliveries  1965 May-
Production Schedules and Acceptances Delinquent Deliveries  1965 May-
Production Schedules and Acceptances Delinquent Deliveries  1965 May-
Production Schedules and Acceptances Delinquent Deliveries  1965 May-
Production Schedules and Acceptances Delinquent Deliveries  1965 May-
Production Schedules and Acceptances Delinquent Deliveries  1965 May-
Production Schedules and Acceptances Delinquent Deliveries  1965 May-
Production Schedules and Acceptances Delinquent Deliveries  1965 May-
Production Schedules and Acceptances Delinquent Deliveries  1965 May-
Production Schedules and Acceptances Delinquent Deliveries  1965 May-
Production Schedules and Acceptances Delinquent Deliveries  1965 November-
Production Schedules and Acceptances Delinquent Deliveries  1965 November-
Production Schedules and Acceptances Delinquent Deliveries  1965 November-
Production Schedules and Acceptances Delinquent Deliveries  1965 November-
Production Schedules and Acceptances Delinquent Deliveries  1965 November-
Production Schedules and Acceptances Delinquent Deliveries  1965 November-
Production Schedules and Acceptances Delinquent Deliveries  1965 November-
Production Schedules and Acceptances Delinquent Deliveries  1965 November-
Production Schedules and Acceptances Delinquent Deliveries  1965 November-
Production Schedules and Acceptances Delinquent Deliveries  1965 November-
Production Schedules and Acceptances Delinquent Deliveries  1965 October-
Production Schedules and Acceptances Delinquent Deliveries  1965 October-
Production Schedules and Acceptances Delinquent Deliveries  1965 October-
Production Schedules and Acceptances Delinquent Deliveries  1965 October-
Production Schedules and Acceptances Delinquent Deliveries  1965 October-
Production Schedules and Acceptances Delinquent Deliveries  1965 October-
Production Schedules and Acceptances Delinquent Deliveries  1965 October-
Production Schedules and Acceptances Delinquent Deliveries  1965 October-
Production Schedules and Acceptances Delinquent Deliveries  1965 October-
Production Schedules and Acceptances Delinquent Deliveries  1965 October-
Production Schedules and Acceptances Delinquent Deliveries  1965 October-
Production Schedules and Acceptances Delinquent Deliveries  1965 October-
Production Schedules and Acceptances Delinquent Deliveries  1965 September-
Production Schedules and Acceptances Delinquent Deliveries  1965 September-
Production Schedules and Acceptances Delinquent Deliveries  1965 September-
Production Schedules and Acceptances Delinquent Deliveries  1965 September-
Production Schedules and Acceptances Delinquent Deliveries  1965 September-
Production Schedules and Acceptances Delinquent Deliveries  1965 September-
Production Schedules and Acceptances Delinquent Deliveries  1965 September-
Production Schedules and Acceptances Delinquent Deliveries  1965 September-
Production Schedules and Acceptances Delinquent Deliveries  1965 September-
Production Schedules and Acceptances Delinquent Deliveries  1965 September-
Production Schedules and Acceptances Delinquent Deliveries  1965 September-
Production Schedules and Acceptances Delinquent Deliveries  1965 September-
Production Schedules and Acceptances Delinquent Deliveries  1965 September-
Production Schedules and Acceptances Delinquent Deliveries  1965 September-
Production Schedules and Acceptances Delinquent Deliveries  1966 December-
Production Schedules and Acceptances Delinquent Deliveries  1966 February-
Production Schedules and Acceptances Delinquent Deliveries  1966 January-
Production Schedules and Acceptances Delinquent Deliveries  1966 January-
Production Schedules and Acceptances Delinquent Deliveries  1966 January-
Production Schedules and Acceptances Delinquent Deliveries  1966 January-
Production Schedules and Acceptances Delinquent Deliveries  1966 October-
Production Schedules and Acceptances Delinquent Deliveries  1967 February-
Production Schedules and Acceptances Delinquent Deliveries  1967 January-
Production Schedules and Acceptances  1965 August 31-
Production Schedules and Acceptances  1965 August 31-
Production Schedules and Acceptances  1965 August 31-
Production Schedules and Acceptances  1965 July 1-
Production Schedules and Acceptances  1965 July 1-
Production Schedules and Acceptances  1965 July 30-
Production Schedules and Acceptances  1965 July 30-
Production Schedules and Acceptances  1965 June 1-
Production Schedules and Acceptances  1965 September 30-
Production Schedules and Acceptances  1965 September 30-
Production Schedules and Acceptances  1965 September 30-
Program 7 Depot Maintenance FY70  1969 August-
Program for Rebuild and Reissue of AACOMS First Generation Multichannel Communications Equipment  1968 September-
Program to Rebuild and Reissue First Generation Multichannel Communications Equipment  1969 September-
Project "Roving Bear"  1966 April-
Project CEFIRM Leader  1968 January-
Project Crazy Cat  1967 February-
Project Laffing Eagle  1968 January-
Project Managed Item in Support of SEA  1967 May-
Project Management Master Plan for UNICOM/STARCOM  1964 Second Quarter-
Project Manager's Weekly Significant Action Report  1965 August-
Project Manager's Weekly Significant Action Report  1965 August-
Project Manager's Weekly Significant Action Report  1965 August-
Project Manager's Weekly Significant Action Report  1965 December-
Project Manager's Weekly Significant Action Report  1965 December-
Project Manager's Weekly Significant Action Report  1965 December-
Project Manager's Weekly Significant Action Report  1965 December-
Project Manager's Weekly Significant Action Report  1965 July-
Project Manager's Weekly Significant Action Report  1965 May-
Project Manager's Weekly Significant Action Report  1965 May-
Project Manager's Weekly Significant Action Report  1965 May-
Project Manager's Weekly Significant Action Report  1965 November-
Project Manager's Weekly Significant Action Report  1965 November-
Project Manager's Weekly Significant Action Report  1965 November-
Project Manager's Weekly Significant Action Report  1965 November-
Project Manager's Weekly Significant Action Report  1965 October-
Project Manager's Weekly Significant Action Report  1965 October-
Project Manager's Weekly Significant Action Report  1965 October-
Project Manager's Weekly Significant Action Report  1965 October-
Project Manager's Weekly Significant Action Report  1965 October-
Project Manager's Weekly Significant Action Report  1965 September-
Project Manager's Weekly Significant Action Report  1965 September-
Project Manager's Weekly Significant Action Report  1965 September-
Project Manager's Weekly Significant Action Report  1965 September-
Project Manager's Weekly Significant Action Report  1966 April-
Project Manager's Weekly Significant Action Report  1966 April-
Project Manager's Weekly Significant Action Report  1966 April-
Project Manager's Weekly Significant Action Report  1966 August-
Project Manager's Weekly Significant Action Report  1966 August-
Project Manager's Weekly Significant Action Report  1966 August-
Project Manager's Weekly Significant Action Report  1966 August-
Project Manager's Weekly Significant Action Report  1966 August-
Project Manager's Weekly Significant Action Report  1966 August-September-
Project Manager's Weekly Significant Action Report  1966 February-
Project Manager's Weekly Significant Action Report  1966 February-
Project Manager's Weekly Significant Action Report  1966 February-
Project Manager's Weekly Significant Action Report  1966 February-
Project Manager's Weekly Significant Action Report  1966 February-
Project Manager's Weekly Significant Action Report  1966 January-
Project Manager's Weekly Significant Action Report  1966 January-
Project Manager's Weekly Significant Action Report  1966 January-
Project Manager's Weekly Significant Action Report  1966 January-
Project Manager's Weekly Significant Action Report  1966 January-
Project Manager's Weekly Significant Action Report  1966 July-
Project Manager's Weekly Significant Action Report  1966 July-
Project Manager's Weekly Significant Action Report  1966 July-
Project Manager's Weekly Significant Action Report  1966 July-
Project Manager's Weekly Significant Action Report  1966 June-
Project Manager's Weekly Significant Action Report  1966 March-
Project Manager's Weekly Significant Action Report  1966 March-
Project Manager's Weekly Significant Action Report  1966 March-
Project Manager's Weekly Significant Action Report  1966 March-
Project Manager's Weekly Significant Action Report  1966 March- April-
Project Manager's Weekly Significant Action Report  1966 May-
Project Manager's Weekly Significant Action Report  1966 May-
Project Manager's Weekly Significant Action Report  1966 May-
Project Manager's Weekly Significant Action Report  1966 May-
Project Manager's Weekly Significant Action Report  1966 May-
Project Manager's Weekly Significant Action Report  1966 May-June-
Project Manager's Weekly Significant Action Report  1966 November-
Project Manager's Weekly Significant Action Report  1966 November-
Project Manager's Weekly Significant Action Report  1966 November-
Project Manager's Weekly Significant Action Report  1966 October 17-21-
Project Manager's Weekly Significant Action Report  1966 October-
Project Manager's Weekly Significant Action Report  1966 October-
Project Manager's Weekly Significant Action Report  1966 October-
Project Manager's Weekly Significant Action Report  1966 October-
Project Manager's Weekly Significant Action Report  1966 October-
Project Manager's Weekly Significant Action Report  1966 September-
Project Manager's Weekly Significant Action Report  1966 September-
Project Manager's Weekly Significant Action Report  1966 September-
Project Manager's Weekly Significant Action Report  1966 September-
Project Orange Ball  1969-
Project Raw Deal, UH-1 Aircraft  1967 February-
Project SECMA (RF Detonation of Mines)  1968 May-
Project SECMA personnel  1968 March-
Project SECMA  1967 November-
Project Study AMCB 2-69 "Interrelationships of AMC Major Subordinate Commands  1969 March-
Proposal for Expedited Procurement of Weather Radar Set AN/TPS-41 for SEA  1968 February-
Proposal to Expedite Development of Meteorological Data Sounding System AN/UMQ-7  1966 May-
Proposal to Fund Procurement of ED Models of Meteorological Data Sounding System AN/UMQ-7(V) (MDSS)  1968 September-
Proposed Operations Research Study  1966 October-
Proposed Organization for Testing, Training and Support of SEA NITEOPS Program  1968 May-
Proposed Procurement of Integrated Wide Band Communications Systems (IWCS)  1965 August-
Proposed Prototype of a Modified AN/MTC-1 Switching Central for Division Use, and Prototype AN/MSC-29  1965 January-
Proposed QMR on a manned Aerial Surveillance system  1965 September-
Proposed Referral to Small Business Administration-- ID 1189 ()/PR- Systems Engineering & Consultant Corporation  1969 June-
Proposed Transfer of Electronic Responsibilities  1966 September-
Proposed Transfer of Electronic Warfare Responsibilities  1966 September-
Proposed USAECOM Area Office, Thailand  1967 March-
Provisioning Requirements for Project 972 Equipments  1969 November-
Psychological Warfare Broadcasting System, Transmitter AN/TRT-22, Receiver AN/TRR-18  1964 August-
Public Address Set AN/UIH-6(V)  1969 February-
Public Address Set AN/UIH-6(V)  1970 March-
Public Address Set AN/UIH-6(V)  1970 November-
Public Address Set, General Purpose, AN/GIH-3  1965 July-
Publication of installation details of security devices  1969-
Puerto Rico Tests Project Hulfish  1967 March-
QMR for a special countermeasures system  -
QRP-68, AN/TPN-8 in S-141 shelter and QRP-69, POC and FCC  1965 April-
Quality Hardware Report  -
Quality Hardware Report  -
Quality Hardware Report  -
Quality Hardware Report  -
Quality Hardware Report  -
Quality Hardware Report  -
Quality Hardware Report  -
Quality Hardware Report  -
Quality Hardware Report  -
Quality Hardware Report  -
Quality Hardware Report  -
Quality Hardware Report  -
Quality Hardware Report  -
Quality Hardware Report  -
Quality Hardware Report  -
Quality Hardware Report  -
Quality Hardware Report  -
Quality Hardware Report  -
Quality Hardware Report  -
Quality Hardware Report  -
Quality Hardware Report  -
Quality Hardware Report  -
Quality Hardware Report  -
Quality Hardware Report  -
Quality Hardware Report  -
Quality Hardware Report  -
Quality Hardware Report  -
Quality Hardware Report  -
Quality Hardware Report  -
Quality Hardware Report  -
Quality Hardware Report  -
Quality Hardware Report  -
Quality Hardware Report  -
Quality Hardware Report  -
Quality Hardware Report  -
Quality Hardware Report  -
Quality Hardware Report  -
Quality Hardware Report  -
Quality Hardware Report  -
Quality Hardware Report  -
Quality Hardware Report  -
Quality Hardware Report  -
Quality Hardware Report  -
Quality Hardware Report  -
Quality Hardware Report  -
Quality Hardware Report  -
Quality Hardware Report  -
Quality Hardware Report  -
Quality Hardware Report  -
Quality Hardware Report  -
Quality Problems with Depot Furnished Radar Set AN/TPN-18, p/o AN/TSQ-71, -72 (QR67-51)  1967 November-
Quick Reaction Assistance Teams ,Vietnam  1967 March-
Quick Reaction Project 66-25  1967 February-
Quote of 8 October 1964 letter from the Adjutant General  1964 October 16-
R&D Reports from RVN  1967 November-
R&D Team Letter (AN/PVS-3)  1969 February-
R&D Team Member Correspondence  1968 March-
R&D Team Member Report from Visit to Bangkok  1968 February-
R&D Team Report from SEA  1968 February-
R&D Team Test Facility  1967 June-
R&D Team in Vietnam  1967 November-
R&D Team in Vietnam  1968 February-
R&D Team in Vietnam  1968 January-
R&D Team in Vietnam  1968 June-
R&D Technical Liaison Team SEA  1968 April-
R&D Technical Liaison Team in Vietnam  1968 April-
R&D Technical Liaison Team  1967 July-
R&D Technical Liaison Team  1968 April-
RAC study  1966 December-
RADA Military Potential Test  1969 November-
RAWIN Set: AN/GMD-1  1966 July-
RCA Handheld Radar  1967 December-
RDTE FY 1971 Funding  1970 November-
REDCAPE Shortages  1968 September-
RF Amplifier for AN/PRC-25  1965-
Radar Set AN/MPQ-10A  1966 December-
Radar Set AN/MPQ-4A  -
Radar Set AN/MPQ-4A, S/N41  1966 December-
Radar Set AN/MPQ-4A, Training Deficiencies  1966 February-
Radar Set AN/PPS-6  1966 April-
Radar Set AN/TPS-25 for use in Vietnam  1968 June-
Radar Set AN/TPS-25 for use in Vietnam  1968 May-
Radar  1969 December-
Radar  1971 May-
Radar  1974 December-
Radiacmeter IM-174/PD  1965 June-
Radiacmeter IM-174/PD  1965 November-
Radio Altimeter for Helicopter Use  1967 August-
Radio Altimeters for Helicopter Use  1967 August-
Radio Set AN/GRC-26  1966-
Radio Set AN/PRC-41  -
Radio Set AN/PRC-62  1963-
Radio Set AN/PRC-87 and AN/VRC-34  1966 August-
Radio Set AN/URC-68  1968-
Radio Set Control Group AN/GRA-39  1966 June-
Radio Set HC-162  1965-
Radio Sets AN/PRT-4 and AN/PRR-9  1966 March-
Radio Sets are being received in the field in damaged condition  1966 May-
Radio Terminal Set AN/GRC-163  1967 November-
Radio Terminal Set AN/MRC-73 and Shelter S-181/MRC-73  1965 March-
Radio Terminal Set AN/TRC-112  1964 August-
Radio Transmitter AN/PRT-4 and Radio Receiver AN/PRR-9  1965-
Radio Transmitter AN/TRT-22 and Radio Receiving and Monitoring Station AN/trr-18 (QR 72 and 73)  1965 March-
Radios  1969 December-
Radios  1969 December-
Radios  1969 November-
Radios  1970 December-
Radios  1970 November-
Radios  1970 October-
Radios  1971 August-
Radios  1971 August-
Radios  1971 February-
Radios  1974 June-
Re-evaluation of Army Reorganizations  1966 March-
Reassignment of Functions of Project Officer for Avionics Retrofit  1969 August-
Receipt of New Procurement Unsuitable for Issue  1968 August-
Reclassification of Camera Set, Still Picture KS-100A from Limited Production Urgent to Standard  1968-
Recognition for Outstanding Accomplishment in Science or Technology for SEA  1968 April-
Recognition of Civilian Employees Completing Service in the Republic of Vietnam  1967 May-
Recognition of Civilian Employees Performing Duty in Vietnam  1967 November-
Recognition of Civilian Employees Performing Duty in Vietnam  1967 October-
Recognition of Civilian Service in Vietnam  1968 June-
Recognition of ECOM Civilian Employees for Vietnam Service  1968 August-
Recognition of ECOM Employees for Vietnam Service  1968 June-
Recognition of Performance, Mr. Ivan F. Dodd  1967 January-
Recommendation for Approval of Unusual Progress Payments ARF Products, Inc.  1970 October-
Recommendation for Non-Deployment of Airborne Data Annotation System AN/AYA-5, DAAB07-67-C-0707  1968 October-
Recommendation that TT-580 () P/U continue to be considered for use in LEFT FOOT radio teletype link  1968 November-
Recommendation to Halt Deployment of OH-6A (Follow On) Until Manuscripts are Available for Packing  1968 November-
Recommendations and Request for Action Concerning AN/GRC-50, AN/GRC-103, AN/GRC-143, AN/GRC-144  1969 August-
Recommendations and Request for Action Concerning AN/GRC-50, AN/GRC-103, AN/GRC-143, AN/GRC-144  1969 August-
Recommendations to Final Report on Observations of VII Corps CPX  1968 July-
Recommendations to Maintain Production Line Continuity  1968 April-
Recommended Assignment  1967 July-
Recommended Changes in Supply Management Policies for Electronic Repair Parts  1964 December-
Recommended Revision to CMMP for receiving sets, Countermeasures AN/TLR-29 and AN/TLR-30  1967 December-
Recommended Structure for ECOM Assistance in RVN  1967 November-
Recommended TOE Change  1965 December 10-
Reconfiguration of the Army Area Communications System  -
Recurring PCS Supply Assistance  1970 April-
Red Ball Reporting  1966 June-
Red Ball Reporting  1967 November-
Red Ball Requisitioning Pro  -
Red Ball Requisitioning Procedures  1967 December-
Red Line Report Power Amplifier for Radio Set  1966 August-
Red Line Report on Tactical Extended Range Antenna System (AN/PRA-6 and AN/GRA-93)  1966, November 14-
Reduction in Force  1970 March-
Reduction of Back Order Volume  1965 August-
Reduction of Back Orders  1965 August-
Reductions in requirements for BA-4386 through September 1969  1969 September-
References to the K-63 Radio Set  1970 c.-
Relay K1B, p/o Public Address Set AN/UIH-5  1968 May-
Release of End Items for Issue  1968 May-
Release of Motion Sensing Transmitter AN/PRT-11  1969 August-
Release of OSD Deferral DA Project  1967 c.-
Reliability Improvement of Selected Equipment (RISE) Increase Reliability of Systems  1970 April-
Reliability Improvement of Selected Equipment (RISE) Increase Reliability of Systems  1970 May-
Reliability Report on Radio Set AN/GRC-106  1967 December-
Reliability Requirements, Flasher System, Photographic Aircraft IS-59A  1968 May-
Reliability Testing AN/PRC-77  1967 March-
Reliability on AN/AAS-24 and AN/APS-94D  1969 January-
Reliability on AN/AYA-5, AN/AAS-24, and AN/APS-94D  1968 September-
Reliability on AN/AYA-5, AN/AAS-24, and AN/APS-94D  1968 September-
Remote View System for Helicopter Night Operations Installed in UH-1 Helicopter  1966 January-
Renewal of LP Type Classification for Night Vision Sight, Crew Served Weapons  1966 November-
Reorganization Involving Functional Transfer  1967 December-
Reorganization Involving Functional Transfer  1968 January-
Reorganization of R&D at USAECOM  1965 c.-
Reorganization of Research and Development  1965 June-
Reorganization of Technical Assistance Program  1970 April-
Reorganization of Unit  1966 October-
Reorganization of the Army, 1962  1962-
Repair Parts Support for Radio Set AN/PRC-74  1967 December-
Repair Parts Support for Radio Set AN/PRC-74  1968 April-
Repair Parts for Second Generation Medium Capacity AACOMS Equipment  1969 January-
Repair and Return and Quick Reaction Projects Authorization  1969 November-
Repair and/or Overhaul of AN/ASN-64 and Components Canadian Commercial Corporation  1969 January-
Replacement for Liaison Team  1968 August-
Replacement for Liaison Team  1968 July-
Replacement for Liaison Team  1968 July-
Replacement for R&D Liaison Team  1967 December-
Replacement for R&D Liaison Team  1967 October-
Replacement for R&D Liaison Team  1967 October-
Replacement for R&D Liaison Team  1968 June-
Replacement for R&D Liaison Team  1968 June-
Replacement for R&D Liaison Team  1968 June-
Replacement for R&D Liaison Team  1968 September-
Replacement for Telectra Selective Voltmeter  1969 February-
Replacement of AN/GRC-26  1965-
Replacements for R&D Liaison Team  1968 April-
Replacements for R&D Liaison Team  1968 April-
Replacements for R&D Liaison Team  1968 April-
Replacements for R&D Liaison Team  1968 May-
Report of Activity on IPG-1 RQNS Processed this Activity for period 8 Oct 64 though 14 Oct 64  1964 October-
Report of Investigation, Failure of Equipment Employing Solid State Devices  1965 March 9-
Report of Project…Service Test of Telephone Terminal AN/TCC-49  1962 November-
Report of Trip to Canal Zone on 13 June through 13 July 1955  1955 July-
Report of Visit to Pacific Area  1964 November-
Report of Visit to the Pacific Area  1964 November-
Report of Visit to the Pacific Area  1965 April-
Report of the Army Scientific Advisory Panel Ad Hoc Group on Hostile Artillery Locating Systems  1973 April-
Report on Composition of R&D Civilian Workforce  1967 November-
Report on Feasibility Demonstration of AN/PRC-25 Antennas and Lightweight Speaker  1966 October-
Report on Human Factors of ECOM Equipment in Vietnam  1968 June-
Reporting Procedures Vietnam and Dominican Republic Reports  1965 September-
Reporting Procedures for Vietnam/Army Build-up  1968 March-
Reporting of Status, NBSV System  1968 March-
Representation on Joint Coordinating Committee on Simulated Enemy Electronic Warfare Equipment  1969 June-
Request for Additional FY65 O&MA Sub-Allocation  1964 November-
Request for Additional Facilities for CS&TA Laboratory at Fort Monmouth, NJ  1967 June-
Request for Additional High Grade Spaces for Production Surveillance Function within ECOM  1967 February-
Request for Additional Leased Space for Night Vision Laboratory  1970 June-
Request for Additional Officer Space  1967-
Request for Additional Personnel Spaces  1965 September-
Request for Additional SEA Civilian Spaces for PM AACOMS  1967 September-
Request for Approval of Determination and Findings Mobile Weather Radar AN/TPS-41 (XE-2)  1966 November-
Request for Approval of Determination and Findings regarding Study of Susceptibility of Radar Set AN/TPQ-28( ) - PR&C number 68-EL-6012  1967 September-
Request for Approval of Shift Sole Source Procurement  1970 July-
Request for Approval of Sole Bid Received on Competitive Solicitation  1970 December-
Request for Approval of Sole Source PRON  1969 November-
Request for Approval of Sole Source Procurement PRON 09-0-84116-01  1970 May-
Request for Approval of Sole Source Procurement  1969 November 25-
Request for Approval of Sole Source Procurement  1970 June-
Request for Approval of Sole Source Procurement  1970 May-
Request for Approval of Sole Source Procurement  -
Request for Approval of Sole Source Procurement/Test Sets TSEC/ST-23  1969 October-
Request for Approval or Full Release, Radio Teletypewriter Set AN/GRC-122  1970 December-
Request for Authority to Issue Extended Range Antenna System, AN/GRA-93  1969 September-
Request for Authority to Issue Landing Control Central AN/TSQ-71A (LP)  1969 March-
Request for Authority to Issue New Material, Signal Generator AN/URM-103  1969 September-
Request for Authority to Issue Radio Set AN/GRC-106 Magnavox Contract  1970 February-
Request for Authority to Issue Radio Set AN/URC-68 and Test Set TS-2688/URC-68, Magnavox Company  1969 April-
Request for Authority to Issue Radio Terminal Set AN/GRC-163  1967-
Request for Authority to Issue SLAE  1969 May-
Request for Authority to Issue Satisfactory Material Command Communications Equipments, AN/TRC-146 and AN/MRC-119  1967 July-
Request for Authority to Issue Satisfactory Material Public Address Set AN/UIH-6(V), Previously Identified as Public Address Set AN/GIH-3  1968 May-
Request for Authority to Issue Satisfactory Material Radar Set, AN/MPQ-4A  1969 September-
Request for Authority to Issue Satisfactory Material Radiacmeter IM-174A/PD on Contract DAAB05-67-C-1625  1968 October-
Request for Authority to Issue Satisfactory Material, Coder Burst Transmission Group, AN/GRA-71  1969 March-
Request for Authority to Issue Satisfactory Material, Power Supply PP-2953A/U  1969 February-
Request for Authority to Issue Satisfactory Materiel, Telephone Terminal AN/TCC-50  1970 October-
Request for Authority to Issue Satisfactory Materiel, Telephone Terminal AN/TCC-72  1970 March-
Request for Authority to Issue Test Set, Transponder AN/APM-239A  1968 April 18-
Request for Authority to Issue, on a Conditional Basis, Satisfactory Material, Radio Transmitters, AN/PRT-4, AN/PRT-4A, Radio Receiver AN/PRR-9, and Channel Alignment Indicator ID-1189/PR  1969 June-
Request for Authority to Wear Civilian Clothing  1969 March-
Request for Authorization for Sole Source Procurement Action  1969 October-
Request for Authorization for Sole Source Procurement Action  1969 October-
Request for Authorization of Additional Funds for Radar Set AN/APS-94D P/O MOHAWK, OV-1D Aircraft  -
Request for Authorization of Sole Source Procurement Action  1970 January-
Request for Authorization of Sole Source Solicitation of Field Service Representatives  1970 May-
Request for Award Approval Sole Offer Competitive Solicitation Invitation for Bid DAAB05-70-B-0571  1970 June-
Request for Award Approval- Sole Offer Competitive Solicitation  1970 February-
Request for Award Approval- Sole Offer- Competitive Solicitation Invitation for Bids  1970 June-
Request for Award Approval; Sole Bidder- Restricted Competitive Solicitation RFP  1970 June-
Request for Award, Kelleher  1968 August-
Request for Certificate of Necessity for NVL Leasing  1968 January-
Request for Comments and Recommendations on ET, ST, Env. Test, Test Report for: Tactical Extended Range Antenna System, Antenna Kit AN/PRA-6, Improved Antenna Group /PRA-6  1968 November 22-
Request for Conditional Release of ATCC Set AN/PSQ-75 Project MUZ ENSURE 121  1968 January-
Request for Data Concerning the Quality of Army Materiel  1967 May-
Request for Detail of Mr. Edward J. Fister  1966 March-
Request for Expeditious Shipment of Calcium Hydride Chargers  1968 October-
Request for Extension of Limited Production Authorization for Flight Coordination Central, AN/TSC-61A  1969 December-
Request for Extension of Limited Production Authorization for Landing Control Central, AN/TSQ-71A  1970 January-
Request for Extension of Limited Production Authorization for Landing Control Central, AN/TSQ-71A  1970 May-
Request for Increase in 3rd Quarter, FY67 Overtime Limitation  1967 March-
Request for Increased Personnel Authorization  1969 September-
Request for Leasehold Acquisition of Space for the Night Vision Laboratory  1967 April-
Request for Limited Direct/General Aircraft Maintenance Authority  1968 April-
Request for New Equipment Training Team  1968 May-
Request for Post-Award Approval for Personal Services Contract No. DA 28-043 AMC-01715 Fairchild Camera and Instrument Corporation  1966 March-
Request for Post-Award Approval for Personal Services Contract No. DA 28-043 AMC-01900 SCM Corporation, Kleinschmidt Division  1966 May-
Request for Procurement of Recordak Lodestar Microfilm  -
Request for Rainfall Data from Taiwan  1968 June-
Request for Release of Antenna AS-1729/VRC for Issue to Troops  1969 September 17-
Request for Release of Antenna AS-1729/VRC  1969 September 25-
Request for Release of Loop Antenna AT-784 ()/PRC for Issue to Troops  1969 July-
Request for Release of Power Supply PP-4763A/GRC for Issue to Troops  1969 September-
Request for Release of Transient Suppressor MX-7778A/GRC for Issue to Troops  1969 June 23-
Request for Reliability Criteria Applicable to Initial Production Test, Components of AN/GGC-9  1969 October-
Request for Security Clearances  1964 September-
Request for Sole Source Approval for Procurement of 20, 305 each MC-80-CU Microphone Dynamic  1970 February-
Request for Sole Source Approval for Procurement of Various Components of the AN/TPN-8/18 and AN/TSQ-71/72 Radar Sets  1970 June-
Request for Sole Source Approval for Procurement of Various Components of the AN/TPN-8/18 and AN/TSQ-71/72 Radar Sets  1970 June-
Request for Sole Source Procurement, Approval…Dry Battery, Mallory Part #303832  1970 December-
Request for Support of LOH Consoles  1969 February-
Request for Technical Investigation AN/PRC-25  1968 June-
Request for Tracer Action (Modified Tents for AN/MPQ-4)  1966 July-
Request for a Technician to Serve on the R&D Team in Vietnam  1968 February-
Request for a Technician to Serve on the R&D Team in Vietnam  1968 May-
Request for additional funding, CM set AN/ALQ-67 (XE-5)  1969-
Request for temporary Spaces for SEA Work  1966 November-
Requirement for AN/VRC-46  1968 January-
Requirement for Expediting Turnaround of ECOM Other Than RCS CSGLD-1360 Equipment in FY 68 Depot Maintenance Programs  1968 February-
Requirement for RF Modules for Radio Terminal AN/TRC-129  1968 September-
Requirements for Build-Up  1965 September-
Requisitioning of INFANT Peculiar Parts  1970 December-
Requisitions for units on YUX lists  1964 August-
Research and Development Performance  1967 July-
Resolution of Field Problems: Motor Generator PU-545/A and PU-573/A  1970 April 30-
Responsibilities re Contract for PCM Multiplexer Equipment  1965 March-
Resupply of PACOM Under Wartime Conditions  1965 February-
Retention of Radio Sets AN/PRC-8, 9, and 10 by Units Being Deployed to SEA  1965 August-
Return of wire WD-1/TT  1964 September-
Revenue and Expenditure Control Act of 1968  1968 October-
Review of Advance Procurement Plans and Secretarial Review and Notation of Selected Contracts  1969 March-
Review of EW-75 Study Reports  1971 February-
Review of Mission and Activities  1968 October-
Review of Mission and Activities  1968 October-
Review of Plan of Test "Integrated Engineering/Service Test of Radio Terminal Set AN/TRC-112  1964 October-
Review of SEA NITEOPS Contractual Requirements for Maintainability and Reliability  1968 July-
Review of SEA NITEOPS Contractual Requirements for Maintainability of Reliability  1968 July-
Review of USAECOM Meteorological Support Activity  1967 June-
Review of the responsiveness of the Army Supply System to Increased Demands  1966-
Revised Development Schedule for SAM-D System  1970 April-
Revised Maintenance Concepts for Communications-Electronics Equipment  1970 June-
Revised Maintenance Concepts for Missile and Electronics Material  1969 November-
Revised Maintenance Concepts for Missile and Electronics Materiel  1969 October-
Revision of Demand Criteria for Establishment of Levels  1967 December-
Revision of Supply and Maintenance Concepts for USAECOM Materiel  1969 August-
S-318 Shelters for Production of AN/GRC-142/122  1969 July-
SEA Action Sheet #142- AN/APX-44  1967 December-
SEA Action Sheet #272 (Low Light Level TV Development)  1967 June-
SEA Action Sheet No. 147 (AN/FSQ-75 Support  1968 May-
SEA Backorder Reference Code  1968 March-
SEA Equipment List  -
SEA Historical Report  1968 December-
SEA Lessons Learned Conference  1973 c.-
SEA NITEOPS Integrated Logistic Support Plan  1968 June-
SEA NITEOPS Repair Parts Support  1969 April-
SEA Niteops Meeting re: Equipment Interfaces, Requirements for OFE Vehicles and Related Equipment, Establishment of Management and Working Level Teams  1967 December-
SEA Repair and Return Authorized Item List of Electronics Equipment  1970 March-
SEA Requirements  1966 December-
SEA  1965 March- 1966 December-
SEA  1967 January- 1967 December-
SELOR  1967 October-
SGS Proc. Specs., SCL-T Specs, and Depot Repair Stds.  1969 March-
SHORAD C2 MENS USATRADOC CAN 57445  1980 January-
SLAE Deliveries for OH-6A  1969 May-
SLAE Interface Problems in OH-6A  1969 March-
SLAE Production Status Report for May and June  1969 June-
SLAE Repair/Overhaul  1969 May-
SLAE Support Item Status  1969 October-
SLAE contract, Sylvania  1969-
SLAE in OH-6A Aircraft  1969 March-
SLAE  1969 February-
STANO Master Plan (STANMAP) Annex D Plan for Execution of Army Responsibilities for SEA Operational Sensor Systems  1971 January-
STIR Story in Vietnam  1967 November-
STR Distribution Status  1967 December-
Sacramento Depot Develops Rapid Cleaning of Delicate Equipment  1968 August 15-
Safe Delivery of Electronics Equipment to Vietnam  1967 December 22-
Safe Delivery of Electronics Equipment to Vietnam  1967 November-
Safe Delivery of Electronics Equipment to Vietnam  1967 October-
Saville Coordinating Group (Military Radio Development Review)  1969 June-
Scheduled Deliveries on Procurement Directives  1965 August-
Scheduled Deliveries on Procurement Directives  1965 August-
Scientific and Engineering Support to Vietnam  1968 February-
Searchlight, Infrared AN/VSS-3  1968 December-
Searchlight, Infrared AN/VSS-3  1968 December-
Second generation area communication assemblages employing AN/GRC-50, AN/TCC-45, CX-4245/G, and TD-206  1965 April-
Secretarial Reviews of FY 1966 Procurements  1965 December-
Secretarial Reviews of FY1966 Procurements  1965 December-
Secure Voice Equipment and Aircraft Communications  1965, 1967-
Secure Voice for AN/PRC-77  1967 November-
Security of Small Arms and Ammunition  1966 May-
Selected Tactical Radios DA Programs for SEA Ops  1966-1967-
Semi-Automatic Compass Calibrator, PR&C 67-9050 Project/Task-1E1-41203-D325-07  1967 March-
Service Contracts  1966 March-
Shelter S-280  1967 December-
Shelters  1967 August-
Shipment of 12 voice channel man transportable microwave radio links (ITTFL PICO II equipment)  1967 January-
Shipment of ES-38 Photographic Darkroom  1968 June-
Shipment of KA-76 Camera  1968 June-
Shortage of 26 Pair Cable  1967 December-
Shortage of AN/USN-31  1964 November-
Shortage of Repair Parts for AN/PRC-10 in Vietnam  1964 September-
Signal Corps Agencies Incorporated in US Army Electronics Command, 1962  -
Signal Corps Agencies Incorporated in US Army Electronics Command, 1962  -
Signal Corps General Officers (retired)  1987-
Signal Corps Incorporated in US Army Electronics Command, 1962  -
Signal Equipment in SEA  1965-
Significant Personnel Implication  1967 April-
Silver-Zinc Battery, BB-451/U  1967 February-
Simultaneous Translator Kits AN/TIQ-12 and AN/TIQ-13  1969 February-
Single Sideband Radio for RVN (Vietnam)  1966-
Six Man R&D Technical Liaison Team  1966 December-
Slippage in Production of AN/ARC-116 UHF-AM Radios  1969 June-
Slippage in procurement of the Radio Set AN/VRC-12  1962 October-
Small Starlight Scope AN/PVS-1  -
Sole Source Justification SLAE  1970 April-
Sole Source Justification for Maintenance Support Packages for AN/APS-94D Radar and Associated Special Test Equipment  1969 November-
Sole Source Justification  1970 November-
Sole Source Procurement - Electronic Warfare Laboratory  1970 February-
Sole Source Procurement of AN/PSN-4 (XE-1) (V)  1970 January-
Sole Source Procurement of Support of SEA Operations  1965 August-
Sole Source Procurement on PR&C 70-WL/C-8117  1970 May-
Sole Source Procurement with Technology Service Corporation  1970 June-
Sole Source Procurement with Technology Service Corporation  1970 November-
Sole Source Procurements in Support of SEA Operations  1965 August-
Sole Source Recommendation AN/ARN-83 Direction Finder Set  1970 March-
Sole Source Recommendation- Modification Kits for AN/ASN-64 Doppler Navigation Set  1970 April-
Source Selection Evaluation Bid for Radio Set AN/VRC-12  1967 January-
Source Selection Evaluation Board for Radio Set AN/VRC-12  1967 March-
Spaces for Reconstitution of Moisture, Fungus, Corrosion Protection Capability  1966 October-
Special Acceptance Test Equipment  1969 April-
Special Act Awards for Vietnam Service  1969 May-
Special Assistant for Aviation and Aviation Electronics  1966 November-
Special Awards Ceremony, Civilian Service in Combat Area  1968 August-
Special Inspection, FY 1965, of HQ, ECOM  1965 May 26-
Special Inspection, FY1965, of HQ, USAECOM  1965 May-
Special Inspection, FY1965, of US Army Tropic Test Center  1964 November-
Special Management Items  1968 March-
Special Project to Validate USARV Requirements for Selected Secondary Items  1968 October-
Special Report Company A, 40th Signal Battalion (Construction)  1967 August-
Special Requisitioning and Shipment Control System for C-E Equipment in USARV  1969 November-
Special Resupply Procedures for CH-47, OH-6, CH-54, and UH-1 Aircraft  1967 June-
Special Resupply Procedures for Selected Aircraft  1967 October-
Special Study: COMSEA, Communications Evaluation in Southeast Asia, Final Report,  1969 June-
Special Warfare: U.S. Army  1962-
Specification for Study Effort Multipurpose Drone System  1963 September-
Sperry artillery locating radar  1970 October-
Squad Radio Nomenclature Assignment AN/PRC-88  1969 July-
Squad Radio Nomenclature Assignment AN/PRC-88  1969 July-
Squad Radio Receiver AN/PRR-9 and Transmitter AN/PRT-4 in Tactical Operation Mode  -
Squad Radio Set AN/PRT-4 and AN/PRR-9  1965-
Squad Radio Set AN/PRT-4, AN/PRR-9  1968 November-
Squad Radio  1965-
Squad Radio  -
Squad Radios for CONARC  1969 April-
Staff Study on DS/GS Maintenance Concept for Passive Night Vision Equipment  1970 January-
Staff Study  1966 February-
Staff Study- Commodity Management of Electronic Components in Addition to Power Sources  1964 October-
Staffing for the Narrow Band Secure Voice Systems (NBSVS) Program  1970 May-
Staffing- Civilian Personnel Division  1966 May-
Standard Lightweight Avionics Equipment (SLAE)  1968 September 30-
Stano  1972 August-
Stano  1972 June-
Stano  1973 December-
Statement of Technical Suitability for Release Under AMCR-700-34 (Equipment, AN/GSS-9 Alarm Set, Anti-Intrusion, Quick Reaction 68-17)  1968 September-
Statement of Urgency- Tandem Switch  1968 April-
Statue of Development, Meteorological Measuring Set AN/TMG-22  1967 October-
Status Report of RDT&E Aircraft Requirements  1967 March-
Status Report on Enlisted Personnel Assigned to P&P Directorate  1969 April 22-
Status Report on Magnesium Battery Cost Effectiveness Study  1960 February-
Status of 221st Signal Co. (Pictorial)  1966 July-
Status of AN/APN-118 Development  1962-
Status of AN/MRC-102 and AN/TRC-110 (AN/GRC-50) Repair Parts  1967 March-
Status of M-16 Adapter Assembly for Night Vision Device AN/PVS-2  1969 July-
Status of Manpower, USAECOM  1966 October-
Status of Meteorological Measuring Set AN/TMQ-22 ENSURE  1968 June-
Status of Production of Night Vision Tube  1965 September-
Status of Radar Mortar Locator AN/MPQ-4A  1965 December-
Status of Reliability Program on Radio Set AN/PRC-77 and Amplifier AM-4306/GRC  1967 November-
Status report on the Army AIMS Program  1969-
Stock Fund Obligation Authority  1967 April-
Stock Fund Obligation Authority- Dry Battery Procurement  1967 April-
Stock Fund  1967 January-
Stockage of SIG Items for Use as Maintenance Float in Vietnam  1965 April-
Stockage of SLAE Modules and Printed Circuit Cards  1969 March-
Stockage of Signal Items for Use as Maintenance Float in Vietnam  1965 April-
Strobe Lights  1967 December-
Substitute Radios for AN/GRC-106 in ABN DIV  1965-
Substitute Radios for AN/GRC-106 in ABN DIV  -
Suggested New Operating Procedures Relating to Non-Government Conference Travel  1966 June-
Suitability Statement for AN/APN-171 and UG 1984B  1969 June-
Summary Evaluation of Logistics Data from CSER's 1st Quarter FY70  1969 December-
Summary Information for SEA Monograph  1973 May-
Summary Report and Minutes DEVA IPR, Remote Optical Viewing System  1970 March-
Summary of Reports and Articles from Project SEACORE, Sponsored by the Advanced Research Projects Agency and the USAECOM  -
Summary of T/D Distribution, Reorganization Study Revised Structure  1963 December-
Supplemental FY67 Production Base Support Program, PEMA 4900 and 4090  1966 September-
Supplemental FY67 Production Base Support Program, PEMA 4920  1966 September-
Supplemental Information- 50 Kc Channel Spacing of Aviation UHF Equipment  1967 January-
Supply Bulletin for Repair of NCR 500 Printed Circuit Cards  1970 May-
Supply Effectiveness to Vietnam on ECOM Items  1967 August-
Supply Effectiveness to Vietnam on ECOM Items  1967 December-
Supply Performance Briefing  1967 December-
Supply Performance Improvement Now- SPIN  1967 February-
Supply Performance Improvement Now- SPIN  1967 February-
Supply Performance Improvement Now- SPIN  1967 May-
Supply Performance Improvement Now- SPIN  1968 June-
Supply Performance Reporting  1966 July-
Supply Performance and Back Orders  1967 December-
Supply Performance and Back Orders  1967 December-
Supply Support of Electronics and Communications Equipment  1969 February-
Supply of Repair Parts for AN/PRC-10 to U.S. Army Logistics Center, Japan  1965 April-
Support for AN/ASN-43 Installed in CH-47A Helicopters  1965-
Support for C-E in USAREUR  1968 August-
Support for Communications-Electronics in USAEUR  1968 August-
Support of AN/PRC-25 Radio Set in RVN  1965 April-
Support of Deployed Equipment  1967 February-
Support of Radio Relay Set AN/TRC  -
Support of TACAN AN/ARN-52  1967 August-
Support to Project manager, Night Vision  1969 June-
Supporting Data for OMA Costs related to Vietnam Support  1965 April-
Surveillance Over Selected Shipments to Vietnam  1968 February-
Surveillance Target Acquisition Research Plan (Year 3)  1964 October-
System Functional Requirements and Objectives for Avionics  1966 April-
TACS/ TADS Communications  1970 December-
TEMPEST  1966-
TO&E for AN/TPN-8 Radar Set  1967 February-
TPQ-28 program  1968 February-
TPQ-28 program  1968 January-
TPQ-28 program  1968 November-
TPQ-28 program  1969 January-
TR-20 Village Radio for Thailand  1965 May-
TSC-26 Communications Central  1968 April-
TSEC/KY-28 Program  1967 June-
Tactical Automatic 4-Wire Switching  1967 March-
Tactical Imagery Interpretation Facility, AN/TSQ-43 (TIIF)  1969 July-
Tactical Imagery Interpretation Facility, AN/TSQ-43 (TIIF)  1969 June-
Tactical Imagery Interpretation Facility, AN/TSQ-43 (TIIF)  1969 June-
Tactical Imagery Interpretation Facility, AN/TSQ-43 (TIIF)  1969 September-
Tactical Radio Communications System  1968 September-
Tandem Switching Centers  1968 May-
Task Force for Preparing SEA NITEOPS Integrated Logistics Support Plan  1968 July-
Tech and Admin Responsibility of the Activities and Commands in Support of the MQM-58A Project  -
Technical Assistance Personnel for KMAG  1968 March-
Technical Assistance Program, U.S. Army, Pacific and Worldwide  1964 December-
Technical Assistance Report to Vietnam  1966 December-
Technical Assistance  1967 June-
Technical Assistance  1967 May-
Technical Manual Power Supply Model MS9P1-SC  1968 c.-
Techniques Useful for Dissipating Warm Fog or Clouds  1968 August-
Technology's Test in Vietnam  1985 May-
Technology's Test in Vietnam  -
Telescopic Antenna AN/PRC-25  1966-
Telescoping Antenna for PRC-25  -
Teletypewriter Equipment for Radio Set AN/GRC-108  1965 March-
Teletypewriter Set for Forward Area, Electronic  1965 August-
Temporary hire spaces required as a result of current emergency  1962 October-
Terminally Guided Sub-Missiled Warhead Development Effort for Tactical Surface to Surface Missile  1970 July-
Termination of Project Management for Tactical Imagery Interpretation Facility, AN/TSQ-43  1967 April-
Termination of Project Management for Tactical Imagery Interpretation Facility, AN/TSQ-43  1967 June-
Termination of Specified Contractor Support Personnel for AN/ASN-64  1969 July-
Test Equipment and Power Sources Commodity Area NiCd Aircraft Batteries  1969 October-
Test Equipment and Power Sources  -
The Army Area Communications System  -
The Best is Yet to Come: Prediction or Challenge?  1967 July-
The ECOM Labor Force, 1963- 1971  -
The First Signal Team  1970 c.-
The Jagged Sword  1970s early-
The Jagged Sword  1971, Fall-
The Legacy of Vietnam  -
The President's Economy Program (PEP)  1968 April-
The President's Economy Program (PEP)  1968 January-
The Technical Cooperation Program  1967 August-
The Three Stage Cascade Image Intensifier Tube with Stages Coupled  1965 June-
The U.S. Army Electronics Command- Vietnam  1968 October-
The What, When, How and Where of 1WCS  -
They Help the Army Find 'Em, Fix 'Em, Fight 'Em, Finish 'EM  1966 January-
Third and Fourth Quarter, FY 1963 Civilian Manpower Program  1963 January-
Throat microphones for UH-1 Helicopters  1965 August-
Throat microphones for UH-1 Helicopters  1965 June-
Tour 365  1969, mid-
Transfer of Night Vision Activity  1966 April-
Transient Voltage Suppressor for Use with VRC-12 and GRC-106  1967 February-
Transistor Burn Out in Radar Set AN/PPS-4  1968 April-
Transitional Appointments of Vietnam Era Veterans  1968 July 3-
Transmittal of Minutes  1968 April-
Transmittal of Oversea Requisitions  1964 October-
Transmittal of USAECOM Commodity Management Master Plan- Squad radio: Radio Transmitter AN/PRT-4; Radio Receiver AN/PRR-9  1965 May-
Transponder Set AN/APX-68  1966 May-
Transponder Set AN/APX-72  1967 December-
Transportable Maintenance Calibration Facility AN/TSM-55A  -
Transportation and Storage of Dry Batteries in SEA  1965-
Transportation for R&D Team  1967 July-
Travel to South Vietnam and Thailand  1968 May-
Travel: Comm/ADP Lab Team Member- Vietnam: Schneider, Rugarber  1967 November-
Trip Report  1979 January-
Trip report, re: ACTIV  1966-
Trip to Vietnam as a Representative of COMM/ADP Laboratory  1969 February-
Tripod Mast Adaptor  1967 January-
Troop Location Equipment  1966 August-
Troposcatter Radio Relay Equipment AN/TRC-97/97A  1966 January-
Tube Failure in AN/GRC-106  1968 May-
Tube Type 6544  1965 February-
Tunnel Detection Research  1968 July-
Tunnel Detection Research  1968 July-
Type Classification in Support of FY66 Procurement  1966 March-
Type Classification of Material to Support FY 1970 PEMA Procurement  1969 December-
Type Classification of Non-Standard Items for Air Mobile Division  1965 November-
Type classification in support of FY66 procurement  1966 July-
U-21A Utility Airplane program  1967 April-
U.S. General Accounting Office Review of the Responsiveness of DoD Supply Systems to Increased Military Demands in the Far East  1966 August-
U.S., Red Army Units Compared  1962 February-
UH-1B (?)/C/D Aviation Electronics System Management  1967 August-
UH-1B/D, CH-47, AN/ARC-5, AN/ARC-54  -
UNICOM/STARCOM Project Management Pacific Field Office  1965 June-
US Army ECOM Distribution Directorate Annual Historical Summary  1969-
USAAA Audit of Fort Meade Procurement Division, Procurement and Production Directorate, US Army ECOM  1969 July-
USAAA Audit of Maintenance Activities, US Army Electronics Command, Fort Monmouth, New Jersey  1967 February-
USAAA Audit of Procurement Functions at US Army Electronics Command  1969 July-
USAAA Audit of U.S. Army Electronics Supply System, Audit Report  1965 January-
USAAA Audit of the Army's Supply System for Support of Vietnam, US Army ECOM, Fort Monmouth, NJ USAAA Audit Report No. NE 68-306  1967 September-
USAAA Audit of the Army's Supply System for Support of Vietnam, USAAA Report NE 68-306  1967 October-
USAECOM Avionics Laboratory Aircraft Installation and Test Technical Area Annual Program Review FY1969  1969 July-
USAECOM Capability to React to Emergency Situations  1965 April-
USAECOM FY1970 PEMA Awards Program  1969 December-
USAECOM FY1970 PEMA Awards Program  1969 December-
USAECOM FY1970 PEMA Awards Program  1969 December-
USAECOM Historical Feeder Reports  1968 July-
USAECOM Reorganization Proposal  1963 December-
USAECOM Team in Plant at Sylvania for SLAE  1969 March-
USAECOM and Project Michigan Participation in Exercise SILVER HAND  1965 March-
USAMC Coordination Conference, AN/APM-239A and AN/APM-245  1969 December-
USAMC Directive to Assemble a Catalog  1970 February-
USARV Dry Battery Requirements  1969 May-
USECOM Support of SAM-D  1967 August-
Ultrasonic Detector  1967 December-
Unauthorized Use of POM Project Codes by Vietnam Requisitioners  1967 December-
Unit Readiness  1967 November-
Universal Tactical Antenna  1967 March-
Unsatisfactory Performance of AN/ARN-82 in UH-1 Aircraft  1967 May-
Unsatisfactory Procurement Support for Teletypewriter AN/FGC-52X  1966 June-
Unserviceable Modules  1968 April-
Unserviceable Modules  1968 September-
Update of FYRGRAPHS  1970 August-
Upgrading Communications Systems, SEASIA  1965 May-
Urgent Need for Teletypewriter Sets Suitable for a Tactical Mobile Environment  1966 July-
Urgent Requirement for Dry Battery BA-386  1965 September-
Urgent Requirement for Equipment in Excess of Authorized Allowance (Vietnam)  1965 March-
Urgent Requirement for Equipment in Excess of Authorized Allowance (Vietnam)  1965 March-
Urgent Vietnam Requirements  1965 April-
Use of Military Personnel, Equipment, and Facilities with Civil Disorders  1967 November-
Utilization of Civilian Spaces in Support of SEA  1966 May-
Utilization of Civilian Spaces in Support of SEA  1966 May-
Utilization of Storage Space at SAAD  1967 November-
Utilization of US Army Enlisted Personnel at USAECOM  1969 January 13-
VATLS AN/UVS-1  1968 January-
VATLS AN/UVS-1  1969 May-
VATLS  1967 October-
VLAPA Request, AN/GRC-50 Modification Kits  1969 December-
VNAF LOG Support Interservice Agreement  -
VRC-12 Requirements  1963-
Value Engineering Division Procurement and Production Directorate Historical Summary FY 71  1971-
Vehicle Utilization Survey  1966 June-
Vehicles for R&D Team  1968 May-
Vice President for Back Orders  1967 September-
Viet Night Vision Devices Unveiled at Fort Monmouth  1968 May-
Vietnam Back Order Reconciliation Actions  1967 December-
Vietnam Laboratory Assistance Program, Army  1968 October-
Vietnam Map  1965-
Vietnam R&D team  1967 April-
Vietnam, Detection of Caches and Tunnels  1965 November-
Vietnam: Electronics in the War  1966-
Visit of MG Latta  1968 April-
Visit to USARPAC and Subordinate Commands by MG Latta  1967 December-
Visit to USARPAC by MG Latta and Party  1967 December-
Visit to USARPAC by Major General William B. Latta  1968 January-
Visual Airborne Target Locator System (VATLS) AN/UVS-1  1968 January-
Waiver for Contract Technical Services Personnel  1966 March-
Waiver of Type Classification Requirement to Procure Antenna AS-1922A/AR  1970 March 20-
Waiver of Type Classification Requirement to Procure Antenna  1970 March 13-
War prompts Expansion: 900 More Employees Sought by Command  1966 January 16-
Weapons: Taking the Night from Charlie  1968 May-
Weekly Report on the AN/VRC-12 for period ending 3 August 1962  1962 August 6-
Weekly Significant Action Report  1964 July-
Weekly Significant Action Report  1964 June-
Weekly Significant Action Report  1964 May-
Weekly Significant Action Report  1966 April 29-
Weekly Significant Action Report  1966 August 26-
Weekly Significant Action Report  1966 February 11-
Weekly Significant Action Report  1966 January-
Weekly Significant Action Report  1966 July 22-
Weekly Significant Action Report  1966 July 29-
Weekly Significant Action Report  1966 June 3-
Weekly Significant Action Report  1966 March-
Weekly Significant Action Report  1966 May 27-
Weekly Significant Action Report  1966 September 16-
Weekly Status of Significant Items in Support of SEA  1967 December-
Wire Detection: History and Future  1988 January-
Work Shop on Radio Systems in Forested and or Vegetated Environments  1974 February-
system Integration OV-1D Aircraft  1968 July-
vehicle crash  -
vehicle crash  -
vehicle crash  -
  -
USAECOM newsletter for the month of June 1970  1970 July-
Project AACOMS in Support of SEA Activities  1970 January-1970 December
Historical Monograph, Project Number AMC 61M, ECOM, Logistics Support of the Army in SEA  1965-1970, 1972
Combat Surveillance and Target Acquisition Laboratory SEA Historical Feeder Report  1969-1970
History of Radar Set AN/TPQ-28  1968-
Combat Surveillance, Night Vision and Target Acquisition Commodity Area  1962-1968
Dir of Installation and Services material for History of AMC  1962-1968
Computation Agency SEA Historical Feeder Report  1965-1966
Test Equipment and Power Sources SEA Historical Feeder Report  1965-1966
Test Equipment and Power Sources Commodity Area SEA Historical Feeder Report  1962-1968
Test Equipment and Power Sources SEA Historical Feeder Report  1967-
Support to Free World Forces  1965 February-1966 December
International Logistics Program  1966-
Mutual Security Programs  1967-
Management Systems and Data Automation Feeder Material for Monograph  1969-1973
Labor Relations Office  1969-1970
ECOM Aviation Electronics Agency, St. Louis  1969-1970
ECOM Aviation Electronics Agency, St. Louis  1968-
Selected Tactical Radios  1967-
Selected Tactical Radios  1966-